Skip to content
Town of Hull

Secondary Clarifiers, Grit & Building Upgrades

Solicitation: Not available
Notice ID: ma_commbuys_b88584ffffbe9e372aad
DepartmentTown of HullAgencyWWTF - Waste Water Treatment FacilityStateMAPostedDueMay 06, 2027, 11:00 AM UTCCloses in 384 days

Federal opportunity from WWTF - Waste Water Treatment Facility • Town of Hull. Place of performance: MA. Response deadline: May 06, 2027.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,275,750,127
Sector total $2,275,750,127 • Share 100.0%
Live
Median
$146,315
P10–P90
$27,574$1,433,570
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,275,750,127)
Deal sizing
$146,315 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Map for MA
Live POP
Place of performance
WWTF 1111 Nantasket Avenue Hull, MA 02045 US Email: cjoaquim@town.hull.ma.us Phone: (781) 925-1207
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260001 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems (ZONE A)
Base $55.45Fringe $36.63
Rate
ZONE B)
Base $55.45Fringe $36.63
+97 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 97 more rate previews.
Davis-BaconBest fitstate match
MA20260001 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems (ZONE A)
Base $55.45Fringe $36.63
Rate
ZONE B)
Base $55.45Fringe $36.63
Rate
ATERIAL HANDLER (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)
Base $55.45Fringe $36.63
+96 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Plymouth
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260020 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Hull
Agency
WWTF - Waste Water Treatment Facility
Subagency
WWTF - Waste Water Treatment Facility
Office
Catherine Joaquim
Contracting Office Address
Not available

Description

Secondary Clarifiers, Grit, and Building Upgrades (CWSRF #19112) for replacement of secondary clarifier mechanisms and associate pumps, piping, and valves; structural and architectural repairs and improvements to buildings. Additional Work is included for bidding as alternates (awarded at Owner's Option): Alt A: Scum Pump Replacement; Alt B: Influent Wet Well H2S Coating; Alt C: Ext.Building Repairs; Alt D: Grit System Replacement. DCAMM certification for GC and sub bidders.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 09, 2026
Client-ready brief
Executive summary
medium confidencelocal fallback

WWTF - Waste Water Treatment Facility issued solicitation Secondary Clarifiers, Grit & Building Upgrades, with . Secondary Clarifiers, Grit, and Building Upgrades (CWSRF #19112) for replacement of secondary clarifier mechanisms and associate pumps, piping, and valves; structural and architectural repairs and improvements to buildings. Additional Work is included for bidding as alternates (awarded at Owner's Option): Alt A: Scum Pump Replacement; Alt B: Influent Wet Well H2S Coating; Alt C: Ext.Building Repairs; Alt D: Grit System Replacement.

Secondary Clarifiers, Grit & Building UpgradesWWTF - Waste Water Treatment Facility
What the buyer is trying to do

Secondary Clarifiers, Grit, and Building Upgrades (CWSRF #19112) for replacement of secondary clarifier mechanisms and associate pumps, piping, and valves; structural and architectural repairs and improvements to buildings. Additional Work is included for bidding as alternates (awarded at Owner's Option): Alt A: Scum Pump Replacement; Alt B: Influent Wet Well H2S Coating; Alt C: Ext.Building Repairs; Alt D: Grit System Replacement. DCAMM certification for GC and sub bidders.

Who should pursue this
  • Solicitation contractors with direct experience delivering comparable work for public buyers.
Work breakdown
  • Secondary Clarifiers, Grit & Building Upgrades
  • Review 1 linked source document.
  • DCAMM certification for GC and sub bidders.
Response package checklist
  • Download and review all official solicitation documents and addenda.
  • Confirm submission format, due date, and delivery method with the buyer portal or notice.
  • Prepare pricing, scope response, and required forms/certifications.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Validate insurance, licensing, and any site-access requirements in the official documents.
Pricing strategy
  • Price to the actual scope and staffing assumptions in the official documents.
  • Watch for multi-site, overtime, after-hours, mobilization, or equipment cost drivers.
  • Confirm whether the buyer expects all-inclusive pricing, line items, or optional services.
Teaming and subs
  • Use subs or teaming partners if specialized staffing, equipment, or local coverage is required.
  • Align subcontract scopes to compliance-sensitive work and document responsibilities clearly.
Risks and watchouts
  • Due date is May 6, 2027; verify exact due time and timezone.
  • Do not assume unstated requirements, contract duration, or evaluation factors.
Smart questions to ask
  • Are there mandatory site visits, staffing minimums, or licensing requirements?
  • What exact documents and forms must be submitted at bid time?
  • Are there incumbent, transition, or performance-reporting requirements not obvious from the summary?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Set-aside status is not confirmed.
  • Contracting office/contact is not clearly identified.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.