BUZZARDS BAY WASTEWATER TREATMENT FACILITY CONTRACT OPERATION AND MAINTENANCE SERVICES
Federal opportunity from TADMIN - Town Administrator • Town of Bourne. Place of performance: MA. Response deadline: May 21, 2026. Industry: NAICS 72, 15, 00.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 97 more rate previews.↓
Point of Contact
Agency & Office
Description
Operation and maintenance of a Membrane Biological Reactor (MBR) Wastewater Treatment Facility by a Chief Certified Grade 4 Operator and Backup Certified Grade 3 Operator, capable of operating the installed system in a manner that ensures proper operation. Services will include, but not being limited to, GWDP compliance, normal operation and preventative maintenance, repairs, emergency operation and response program, daily inspections of all equipment, and maintaining daily logs of activities.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town Administrator is seeking bids for operation and maintenance services at the Buzzards Bay Wastewater Treatment Facility, specifically for a Membrane Biological Reactor (MBR). The project requires a Chief Certified Grade 4 Operator and a Backup Certified Grade 3 Operator to ensure compliance with GWDP and effective daily operations. The response deadline for proposals is May 21, 2026, presenting a substantial opportunity for qualified firms in wastewater management.
The buyer aims to secure a qualified contractor to maintain and operate the Buzzards Bay Wastewater Treatment Facility, ensuring compliance with regulatory standards and optimal functionality of the MBR system.
- Companies experienced in wastewater treatment services
- Contractors with certified personnel in MBR operations
- Firms with a strong background in environmental compliance
- Provision of a Chief Certified Grade 4 Operator
- Provision of a Backup Certified Grade 3 Operator
- Daily inspections of all equipment
- Maintaining daily logs of activities
- GWDP compliance monitoring
- Emergency operation and response program
- Preventative maintenance and repairs
- Certificates of operators (Grade 4 and Grade 3)
- Detailed experience in MBR systems
- Proposed operation and maintenance plan
- Pricing structure and cost breakdown
- Compliance assurance documentation
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must adhere to GWDP regulations
- Operators must hold appropriate certifications
- Consider competitive pricing for long-term contracts
- Factor in costs for emergency operations and maintenance
- Local subcontractors for on-site assistance
- Environmental compliance specialists
- Potential changes in regulatory requirements
- Operator certification verification
- Equipment failures during operation
- What is the expected frequency of emergency maintenance?
- Are there specific performance metrics that need to be met?
- What are the penalties for non-compliance?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific budget for the project is not disclosed
- Detailed evaluation criteria for bids
- Information on existing facility conditions
- Specific maintenance targets or key performance indicators
- Compliance verification process details
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.