Chestnut Street Tank Rehabilitation Project
Federal opportunity from BDP01 - Bellingham DPW • Town of Bellingham. Place of performance: MA. Response deadline: Apr 30, 2026. Industry: NAICS 31, 21, 19.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 97 more rate previews.↓
Point of Contact
Agency & Office
Description
Proposed Work includes: coating rehabilitation of the Chestnut Street 1.5 MG Standpipe including spot coating repairs on interior and exterior tank surfaces and the application of a full exterior overcoat system on all exterior surfaces, and other appurtenant work on the tank.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Chestnut Street Tank Rehabilitation Project involves the coating rehabilitation of a 1.5 MG Standpipe, specifically targeting both interior and exterior surfaces. This project, managed by the Bellingham Department of Public Works, includes spot coating repairs and the application of a full exterior overcoat system. Bidders should be prepared to engage in specialized coating projects, reflecting an understanding of water infrastructure maintenance requirements.
The buyer aims to rehabilitate the Chestnut Street Standpipe to ensure its structural integrity and extend its lifespan through thorough and specialized coating processes.
- Companies experienced in tank rehabilitation
- Firms specializing in industrial coating applications
- Contractors familiar with municipal water infrastructure
- Coating rehabilitation of the Chestnut Street 1.5 MG Standpipe
- Spot coating repairs on interior surfaces
- Spot coating repairs on exterior surfaces
- Application of a full exterior overcoat system on all exterior surfaces
- Other appurtenant work related to the tank
- Company qualifications and relevant project experience
- Detailed pricing proposal including labor and materials
- Project timeline and milestones outline
- Safety and quality control plans
- References from similar completed projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Adherence to local and state regulations regarding water infrastructure
- Compliance with safety standards for industrial coatings
- Incorporate both fixed and variable cost components
- Consider the potential for cost overruns due to unforeseen conditions on site
- Consider partnering with subcontractors who specialize in coatings
- Involve assessing environmental and safety compliance partners
- Potential delays due to weather impacting project timelines
- Need for precise condition assessment of tank surfaces which may reveal additional work
- Regulatory compliance issues could arise if not followed meticulously
- What specific regulatory requirements must be met for the rehabilitation process?
- Are there known challenges or considerations specific to the Chestnut Street site?
- What is the expected timeline for permitting and approvals?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific solicitation number provided
- Lack of detailed project schedule
- Absence of attachment documents or links for reference
- Posted date is missing
- No information on site conditions available
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.