100LW Drainage Repair Project 2026-010
Federal opportunity from SSCPS - Purchasing • South Shore Charter Public School. Place of performance: MA. Response deadline: Apr 30, 2026. Industry: NAICS 72, 15, 27.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 97 more rate previews.↓
Point of Contact
Agency & Office
Description
SSCPS is seeking quotes to repair a drainage system at our school campus located in Norwell.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The SSCPS is actively seeking quotes for the 100LW Drainage Repair Project, which is set to be completed by April 30, 2026. This project involves significant repairs to a drainage system at their school campus located in Norwell. Potential contractors should carefully review the requirements and proposal guidelines to ensure compliance with the solicitation.
The buyer aims to repair and enhance the drainage system at their school campus, addressing current deficiencies and ensuring proper water management.
- Experienced civil engineering firms
- General contractors with expertise in drainage systems
- Local contractors familiar with the Norwell area
- Assessment of current drainage system
- Design and engineering of repair solutions
- Procurement of necessary materials
- Implementation of repairs
- Final inspections and project completion
- Completed quotation form
- Project timeline proposal
- Proof of relevant experience
- Insurance certificates
- Compliance with safety regulations
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must adhere to local building codes
- All materials used must meet industry standards
- Competitive pricing based on local market rates
- Cost breakdown by labor, materials, and overhead
- Consider pricing incentives for timely completion
- Partner with local subcontractors for material supply
- Engage environmental consultants for compliance assessments
- Possible collaboration with engineering firms for design input
- Potential delays due to weather conditions
- Risk of underestimating material costs
- Compliance issues with local regulations
- What are the specific drainage issues that need addressing?
- Are there existing plans or maps of the drainage system available?
- What are the local regulations or permits required for this project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Details on specific drainage issues
- Performance period start and end dates
- Bid submission format requirements
- Availability of existing drainage system plans
- Potential for additional site visits
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.