Skip to content
New Bedford Housing Authority

Walkway Replacement

Solicitation: Not available
Notice ID: ma_commbuys_0f00f18264ca510a6f99
NAICS UNSPSC 72-13-17DepartmentNew Bedford Housing AuthorityAgencyMOD001 - ModernizationStateMAPostedDueMar 19, 2026, 02:00 PM UTCCloses in 15 days

Federal opportunity from MOD001 - Modernization • New Bedford Housing Authority. Place of performance: MA. Response deadline: Mar 19, 2026. Industry: NAICS UNSPSC 72-13-17.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,261,759,290
Sector total $3,261,759,290 • Share 100.0%
Live
Median
$275,770
P10–P90
$32,298$4,646,416
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,261,759,290)
Deal sizing
$275,770 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Trent Carter - Office of Modernization New Bedford Housing Authority 128 Union Street; 4th Floor New Bedford , MA 02740 US Email: trent.carter@nbha-ma.org Phone: (508) 997-4852
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 02, 2026
Massachusetts • Hampden
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
POWER EQUIPMENT OPERATOR Group 1
Base: $42.88 • Fringe: $31.04
Match signal: state match
Published Jan 02, 2026
Massachusetts • Middlesex
ELECTRICIAN
Base: $66.17 • Fringe: $37.08
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
Match signal: state match
Published Jan 02, 2026
Massachusetts • Franklin
CARPENTER
Base: $43.33 • Fringe: $27.82
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base: $42.88 • Fringe: $31.04
A (1) Loader
Base: $42.88 • Fringe: $31.04
Match signal: state match
Published Jan 02, 2026
Massachusetts • Suffolk
ELECTRICIAN (Includes Traffic Signalization)
Base: $66.17 • Fringe: $37.08
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
Match signal: state match

Point of Contact

Not available

Agency & Office

Department
New Bedford Housing Authority
Agency
MOD001 - Modernization
Subagency
MOD001 - Modernization
Office
Trent Carter
Contracting Office Address
Not available

More in NAICS UNSPSC 72-13-17

Description

installation of erosion control measures and tree protection; saw cutting of asphalt and concrete; removal and disposal of existing bituminous concrete and concrete walkways/areas; disposal of excavated material; remove and reset curbing; furnish and install new precast concrete & granite curb; installation of root barrier; tree root pruning, preparing the walkway subgrade; concrete and subgrade material testing; protection of work; loam and seed areas; and construction of concrete walkways

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 04, 2026
Executive summary

The Walkway Replacement project under MOD001 aims to address substantial infrastructure needs by installing erosion control measures, including tree protection, and replacing existing walkways. Responses are due by March 19, 2026, with specific tasks including saw cutting asphalt, removing and resetting curbing, and implementing root barriers. This project emphasizes both environmental protection and the successful construction of new concrete walkways.

What the buyer is trying to do

The buyer seeks to modernize infrastructure by replacing damaged walkways and integrating environmental safeguards within the construction process, including erosion control and tree protection measures.

Work breakdown
  • Installation of erosion control measures
  • Tree protection measures
  • Saw cutting asphalt and concrete
  • Removal and disposal of existing walkways
  • Disposal of excavated material
  • Removal and resetting of curbing
  • Installation of new precast concrete and granite curbing
  • Root barrier installation
  • Tree root pruning
  • Preparing walkway subgrade
Response package checklist
  • Completed bid form
  • Company qualifications and past performance examples
  • Detailed work plan including safety and environmental strategies
  • Pricing proposal
  • Insurance and bonding documents
Suggested keywords
constructionenvironmental protectionwalkway replacementerosion controlinfrastructure modernization
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed project budget
  • Specific agency contact information
  • Location details for the project
  • Any required licensing or certifications
  • Information on existing site conditions
  • Potential site access issues
  • Specific materials required for walkway construction
  • Any historical preservation considerations

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.