Skip to content
Town of Burlington

Town Common Walkway Renovation

Solicitation: Not available
Notice ID: ma_commbuys_c5ffe0e2ee2fabf73267
NAICS UNSPSC 72-13-17DepartmentTown of BurlingtonAgencyBTV01 - Purchasing DepartmentStateMAPostedDueMar 12, 2026, 10:00 AM UTCCloses in 8 days

Federal opportunity from BTV01 - Purchasing Department • Town of Burlington. Place of performance: MA. Response deadline: Mar 12, 2026. Industry: NAICS UNSPSC 72-13-17.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,261,759,290
Sector total $3,261,759,290 • Share 100.0%
Live
Median
$275,770
P10–P90
$32,298$4,646,416
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,261,759,290)
Deal sizing
$275,770 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Rachel Leonardo 29 Center St Accounting - 2nd Floor Burlington, MA 01803 US Email: rleonardo@burlington.org Phone: (781) 270-1669
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 02, 2026
Massachusetts • Hampden
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
POWER EQUIPMENT OPERATOR Group 1
Base: $42.88 • Fringe: $31.04
Match signal: state match
Published Jan 02, 2026
Massachusetts • Middlesex
ELECTRICIAN
Base: $66.17 • Fringe: $37.08
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
Match signal: state match
Published Jan 02, 2026
Massachusetts • Franklin
CARPENTER
Base: $43.33 • Fringe: $27.82
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base: $42.88 • Fringe: $31.04
A (1) Loader
Base: $42.88 • Fringe: $31.04
Match signal: state match
Published Jan 02, 2026
Massachusetts • Suffolk
ELECTRICIAN (Includes Traffic Signalization)
Base: $66.17 • Fringe: $37.08
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
Match signal: state match

Point of Contact

Not available

Agency & Office

Department
Town of Burlington
Agency
BTV01 - Purchasing Department
Subagency
BTV01 - Purchasing Department
Office
Rachel Leonardo
Contracting Office Address
Not available

More in NAICS UNSPSC 72-13-17

Description

Town Common Walkway Renovation

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 04, 2026
Executive summary

The Town Common Walkway Renovation project, issued by the BTV01 - Purchasing Department, presents a significant opportunity for firms skilled in outdoor construction and renovation services. The proposal deadline is March 12, 2026, allowing ample time for potential bidders to prepare and submit their responses. With multiple attachments available for download, bidders can access detailed specifications and requirements pertinent to the project.

What the buyer is trying to do

The buyer aims to renovate the Town Common Walkway, improving accessibility and aesthetic appeal for community use.

Work breakdown
  • Review of current conditions of the walkway
  • Preparation of design plans
  • Demolition of existing walkway materials
  • Installation of new walkway materials
  • Landscaping and finishing touches
Response package checklist
  • Completed proposal form
  • Cost estimates and pricing strategy
  • Company qualifications and past performance
  • Detailed project timeline
  • Addenda acknowledgement
Suggested keywords
walkway renovationpublic infrastructureconstruction bidlandscape designcommunity project
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Details on specific materials needed for walkway renovation
  • Budget estimates or funding sources for the project
  • Information on existing conditions of the Town Common Walkway
  • Contact information for the project manager
  • Any required safety certifications or standards

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.