ITB TRD01 HVAC 250420 New HVAC Unit Installation at 5231 (Camp Edwards, MA)
Federal opportunity from MILDV - Military Division • Military Division. Place of performance: MA. Response deadline: Apr 22, 2026. Industry: NAICS 72, 15, 40.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 97 more rate previews.↓
Point of Contact
Agency & Office
Description
Furnish all necessary equipment, labor, parts, materials, supervision and other support services to fulfill the installation of a new package HVAC unit at 5231 MTA Camp Edwards, MA.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
This opportunity involves the installation of a new package HVAC unit at Camp Edwards, MA. The deadline for responses is April 22, 2026, making it crucial for bidders to prepare succinct and competitive proposals. With a focus on service provision, bidders will need to supply all necessary equipment and labor for the project.
The buyer is seeking bids to furnish and install a new HVAC unit, ensuring all necessary equipment, labor, materials, and supervision are provided at Camp Edwards, MA.
- Small businesses familiar with HVAC installations
- Contractors with experience in military installations
- Firms located near Camp Edwards, MA
- Project mobilization to site
- Supply of HVAC unit and materials
- Installation services including labor
- Testing and commissioning of new unit
- Completed bid form
- Technical proposal detailing installation approach
- List of equipment and materials to be provided
- Proof of relevant certifications and experience
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Adhere to SBPP criteria for small businesses
- Ensure compliance with local and federal regulations
- Consider competitive pricing based on local market averages
- Include a breakdown of labor and materials costs for transparency
- Consider teaming with local subcontractors for labor
- Engage suppliers with HVAC unit experience
- Potential delays due to sourcing materials
- Local regulations affecting installation processes
- Are there specific HVAC brands or models preferred by the agency?
- What are the expected timelines for the project phases?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed specifications for the HVAC unit to be installed
- Any existing infrastructure constraints at Camp Edwards
- Local permits required for installation
- Established benchmarks for project timeline
- Environmental regulations specific to the site
- Specific testing requirements post-installation
- Details on supervision oversight
- Prior projects for reference
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.