NOTICE: 240041 Construct Salt Storage Facility at 1700 Area (Camp Edwards, MA)
Federal opportunity from MILDV - Military Division • Military Division. Place of performance: MA. Response deadline: May 21, 2026. Industry: NAICS 72, 15, 23, 10, 00, 12, 13, 16.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 97 more rate previews.↓
Point of Contact
Agency & Office
Description
Project will be eHosted and eBid at www.BidDocs.com. Project is to construct a salt storage facility and loading ramp in the 1700 area of Beaman Rd, Camp Edwards, MA. Facility includes electric service, panel, and LED lighting. FSBs include Electrical Work.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
This opportunity involves the construction of a salt storage facility and loading ramp at Camp Edwards, MA, specifically in the 1700 area of Beaman Rd. The project includes essential features such as electrical service, a panel, and LED lighting. Published on May 21, 2026, this notice is a critical chance for contractors experienced in similar construction and electrical work.
The Military Division (MILDV) is seeking qualified contractors to construct a salt storage facility that meets specified electrical and structural requirements, ensuring it adheres to safety and operational efficiency standards.
- Contractors with experience in facility construction
- Electrical contractors with experience in LED lighting installation
- General contractors with a history of working on government projects
- Companies eligible under the Small Business Participation Program
- Construct salt storage facility
- Construct loading ramp
- Install electrical service and panel
- Install LED lighting
- Complete electrical work for Facility Service Blocks (FSBs)
- Completed proposal
- Company qualifications and experience
- Project cost estimate
- Timeline of project completion
- Proof of relevant licenses and certifications
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure adherence to local building codes and safety standards
- Follow federal procurement guidelines
- Meet environmental regulations for construction
- Consider fixed-price contracting to streamline budget management
- Account for potential costs related to materials and labor for electrical work
- Include contingencies for unforeseen construction obstacles
- Consider partnering with electrical subcontractors due to specialized requirements
- Possible collaboration with local suppliers for construction materials
- Joint ventures with other small businesses to enhance expertise and resources
- Risk of project delays due to permitting or weather conditions
- Potential for cost overruns if scope is not well defined
- Ensure that all electrical work meets current safety codes to avoid liability
- What is the expected timeline for project approval and start date?
- Are there specific environmental considerations to be aware of?
- What is the budget range the agency is anticipating for this project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No additional details on the notice type
- Unclear on the exact specifications for materials
- Lack of detailed timelines outside of the response deadline
- No budget estimates provided
- Absence of specified contractor qualifications required
- No links to detailed project plans or drawings available
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.