Skip to content
Massachusetts Port Authority (Massport)

H296-C2, REHABILITATE TAXIWAY E FROM RW 29 TO RW 5-23, LAURENCE G. HANSCOM FIELD, BEDFORD, MASSACHUS

Solicitation: Not available
Notice ID: ma_commbuys_1f96a780b2bbd9269fef
NAICS UNSPSC 72-10-00DepartmentMassachusetts Port Authority (Massport)AgencyCAPPROG - Capital ProgramsStateMAPostedDueApr 01, 2026, 11:00 AM UTCCloses in 19 days

Federal opportunity from CAPPROG - Capital Programs • Massachusetts Port Authority (Massport). Place of performance: MA. Response deadline: Apr 01, 2026. Industry: NAICS UNSPSC 72-10-00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$394,928,985
Sector total $394,928,985 • Share 100.0%
Live
Median
$133,580
P10–P90
$32,637$752,022
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($394,928,985)
Deal sizing
$133,580 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Luciana Burdi One Harborside Drive Boston, MA 02128 US Email: CPBQuestions@massport.com Phone: (617) 568-5950
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260009 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Dukes, Nantucket
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
Marble & Tile Finisher
Base $49.32Fringe $35.26
+46 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 46 more rate previews.
Davis-BaconBest fitstate match
MA20260009 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Dukes, Nantucket
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
Marble & Tile Finisher
Base $49.32Fringe $35.26
Rate
Marble, Tile & Terrazzo Workers
Base $64.52Fringe $37.51
+45 more occupation rates in this WD
Davis-Baconstate match
MA20260016 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260021 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Middlesex
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Massachusetts Port Authority (Massport)
Agency
CAPPROG - Capital Programs
Subagency
CAPPROG - Capital Programs
Office
Samantha Baker
Contracting Office Address
Not available

More in NAICS UNSPSC 72-10-00

Description

PAVEMENT MILLING, HOT MIX ASPHALT PAVING, CRACK REPAIRS, LIGHT BASE ADJUSTMENTS, LIGHT BASE AND CONDUIT INSTALLATION, PAVEMENT MARKINGS, AIRFIELD LIGHTING VAULT WORK, AND AIRFIELD GUIDANCE SIGNS.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.