FSU invites Bids for Project C2616B Dupont Steam Plant Piping & Breeching Insulation
Federal opportunity from FIADM - Finance and Administration • Fitchburg State University. Place of performance: MA. Response deadline: Apr 30, 2026. Industry: NAICS 72, 13, 00.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 97 more rate previews.↓
Point of Contact
Agency & Office
Description
FSU invites Bids for Project C2616B Dupont Steam Plant Piping & Breeching Insulation - See Attachment for more Information
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Finance and Administration agency at FSU is seeking bids for the Project C2616B, focusing on insulation for piping and breeching at the Dupont Steam Plant. This project includes specific insulation tasks that must align with industry standards, and bidders can find detailed information in the attached document. Notably, the response deadline is set for April 30, 2026, providing ample time for proposal preparation.
FSU aims to enhance the insulation of its Dupont Steam Plant's piping and breeching systems to improve operational efficiency and safety.
- Contractors with experience in industrial insulation projects
- Firms specializing in energy efficiency upgrades
- Companies with a history of working with FSU or similar educational institutions
- Assess current insulation conditions
- Design insulation upgrade proposal
- Install insulation for piping
- Install insulation for breeching
- Completed bid form
- Company qualifications and relevant project experience
- Detailed project approach and timeline
- References from previous similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with environmental regulations related to insulation materials
- Follow all safety protocols for work at industrial sites
- Competitive pricing based on market analysis
- Consider lifecycle cost savings for insulation effectiveness
- Factor in any regional conditions affecting material costs
- Consider teaming with insulation material suppliers for better pricing
- Explore partnerships with engineering firms for design enhancements
- Risk of using non-compliant materials
- Potential delays in project timelines due to unforeseen site conditions
- Bidding competition may lead to lower margins
- What specific insulation materials are preferred or required?
- Are there any existing conditions that could impact insulation work?
- What is the expected timeline for awarding the contract?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific insulation material requirements
- Budget constraints
- Any mandatory pre-bid meetings or site visits
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.