Teaticket Elementary Playground Design and Construction
Federal opportunity from FACPS - Falmouth Public Schools Administration • Falmouth Public Schools. Place of performance: MA. Response deadline: May 04, 2026. Industry: NAICS 72, 10, 00.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 97 more rate previews.↓
Point of Contact
Agency & Office
Description
Falmouth Public Schools is soliciting bids under MGL Chapter 149 for Teaticket Elementary Playground Design and Construction at Teaticket Elementary School. Proposal should include plans/diagram for equipment layout of the playground. The playground should be nautical themed with a ship structure (including bow and stern). See specifications for list of desired equipment. Price proposal and technical (non-price) proposals to be submitted in separate, sealed envelopes.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Falmouth Public Schools Administration is seeking bids for the design and construction of a nautical-themed playground at Teaticket Elementary School, with a deadline for responses by May 4, 2026. Bidders are required to provide both technical and price proposals in separate sealed envelopes, along with plans for equipment layout that includes a ship structure. Emphasis on creativity in design and adherence to specifications is critical to this project.
Falmouth Public Schools aims to enhance the educational environment by developing a new playground area that is engaging and thematically designed to captivate students.
- Landscape architects
- Playground equipment manufacturers
- General contractors with playground construction experience
- Design playground layout and equipment placement
- Construct playground features according to specifications
- Ensure compliance with safety standards
- Deliver a nautical-themed playground with a ship structure
- Provide ongoing maintenance plans post-construction
- Technical proposal detailing design and specifications
- Price proposal in a separate sealed envelope
- Detailed equipment layout plan
- Compliance with MGL Chapter 149
- Evidence of prior successful playground projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must adhere to MGL Chapter 149 guidelines
- Ensure safety and accessibility standards are met
- Pricing should be competitive while accounting for specialized equipment and design demands
- Include cost breakdown by materials and labor for clarity
- Partner with local playground equipment suppliers
- Collaborate with safety inspectors to ensure compliance
- Understanding of local zoning and safety regulations
- Potential delays due to weather impacting construction timeline
- Need for timely delivery of materials and equipment
- What specific types of nautical-themed equipment are prioritized?
- Are there any community engagement activities required during the design phase?
- What is the expected timeline for project approval and funding disbursement?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed specifications for desired equipment
- Submission format details for proposals
- Location-specific requirements for installation
- Budgetary constraints on the project
- Engagement requirements with community stakeholders
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.