Skip to content
Department of Transportation

614152 DISTRICT 4 Scheduled & Emergency Guardrail Repairs at Various Locations

Solicitation: Not available
Notice ID: ma_commbuys_7366aaccdb197d9327c6

Federal opportunity from 0H100 - HIGHWAY • Department of Transportation. Place of performance: MA. Response deadline: Apr 07, 2026. Industry: NAICS 72, 14, 10.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,752,134,213
Sector total $1,752,134,213 • Share 100.0%
Live
Median
$85,800
P10–P90
$27,155$802,160
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,752,134,213)
Deal sizing
$85,800 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Construction Unit 10 Park Plaza Boston, MA 02116 US Email: Noname@state.ma.us Phone: (999) 999-9999
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260003 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
+61 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 61 more rate previews.
Davis-BaconBest fitstate match
MA20260003 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+60 more occupation rates in this WD
Davis-Baconstate match
MA20260009 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Dukes, Nantucket
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
Marble & Tile Finisher
Base $49.32Fringe $35.26
Rate
Marble, Tile & Terrazzo Workers
Base $64.52Fringe $37.51
+45 more occupation rates in this WD
Davis-Baconstate match
MA20260020 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Department of Transportation
Agency
0H100 - HIGHWAY
Subagency
0H100 - HIGHWAY
Office
Alex Deng
Contracting Office Address
Not available

Description

Do Not Use COMMBUYS to Bid on this Project

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 19, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The opportunity involves Scheduled and Emergency Guardrail Repairs for DISTRICT 4 at various locations controlled by the HIGHWAY agency. It's set-aside for Small Business Participation Program (SBPP) eligible bidders. The response deadline is April 7, 2026, allowing sufficient time for preparation and submission, but bidders must note that proposals should not be submitted through COMMBUYS directly, as indicated in the project description.

guardrail repairsemergency repairshighway constructionSBPPDISTRICT 4
What the buyer is trying to do

The buyer aims to engage contractors for both scheduled and emergency repairs of guardrails in DISTRICT 4, ensuring safety and compliance within regional highways.

Who should pursue this
  • Small businesses experienced in highway and roadway construction
  • Contractors with a background in emergency repair work
  • Firms knowledgeable about local safety regulations
Work breakdown
  • Identify locations for guardrail repairs
  • Conduct on-site assessments and evaluations
  • Provide material and labor estimates
  • Execute repair work
  • Ensure compliance with state safety regulations
  • Prepare and submit project reports
Response package checklist
  • Complete proposal form
  • Detailed scope of work
  • Pricing breakdown
  • Timeline for completion
  • Proof of eligibility for SBPP
  • W-9 form
  • Insurance certificates
  • References from previous projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Bids must adhere to local highway safety standards
  • All contractors must be SBPP eligible
Pricing strategy
  • Consider competitive pricing while ensuring quality
  • Factor in costs related to emergency mobilization if applicable
Teaming and subs
  • Partner with local subcontractors for specialized tasks
  • Form joint ventures with other SBPP eligible firms
Risks and watchouts
  • Potential project delays due to weather affecting repair schedules
  • Compliance risks with safety regulations and oversight
  • Competition from other SBPP eligible firms
Smart questions to ask
  • What specific locations need urgent repairs?
  • Are there preferred materials for guardrail repairs?
  • What past challenges have been encountered with similar projects?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific locations for repairs are not detailed.
  • Material specifications are not provided.
  • Past performance metrics or benchmarks missing.
  • Detailed safety compliance requirements not mentioned.
  • Potential penalties for delays or non-compliance are unclear.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.