Skip to content
Department of Transportation

613295 GREENFIELD FAP No. STP(BR-OFF)-003S(930)X Deck Replacement, G-12-022 (144), Log Plain Road

Solicitation: Not available
Notice ID: ma_commbuys_b6298b7f3d7cc5e657f8

Federal opportunity from 0H100 - HIGHWAY • Department of Transportation. Place of performance: MA. Response deadline: Mar 31, 2026. Industry: NAICS 72, 14, 11.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,706,841,172
Sector total $2,706,841,172 • Share 100.0%
Live
Median
$318,072
P10–P90
$42,300$2,065,904
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,706,841,172)
Deal sizing
$318,072 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Map for MA
Live POP
Place of performance
Construction Unit 10 Park Plaza Boston, MA 02116 US Email: Noname@state.ma.us Phone: (999) 999-9999
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260001 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems (ZONE A)
Base $55.45Fringe $36.63
Rate
ZONE B)
Base $55.45Fringe $36.63
+97 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 97 more rate previews.
Davis-BaconBest fitstate match
MA20260001 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems (ZONE A)
Base $55.45Fringe $36.63
Rate
ZONE B)
Base $55.45Fringe $36.63
Rate
ATERIAL HANDLER (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)
Base $55.45Fringe $36.63
+96 more occupation rates in this WD
Davis-Baconstate match
MA20260018 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Essex
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260020 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260014 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Dukes, Nantucket
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
POWER EQUIPMENT OPERATOR (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+6 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Department of Transportation
Agency
0H100 - HIGHWAY
Subagency
0H100 - HIGHWAY
Office
Alex Deng
Contracting Office Address
Not available

Description

Do Not Use COMMBUYS to Bid on this Project

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 03, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The notice involves the replacement of the deck for project G-12-022 (144) at Log Plain Road. This project is under the agency 0H100 - HIGHWAY and is set aside for Small Business Participation Program (SBPP) eligible bidders. The response deadline is March 31, 2026, providing ample time for qualified firms to prepare their proposals.

deck replacementinfrastructure constructionhighway projectssmall business participationcompliance regulations
What the buyer is trying to do

The agency aims to procure services for the deck replacement at Log Plain Road as specified in the project details, enhancing infrastructure safety and functionality.

Who should pursue this
  • Small businesses with experience in transportation infrastructure projects
  • Contractors with a history of successful highway construction projects
  • General contractors with specialized capabilities in deck replacements
Work breakdown
  • Assessment of existing deck conditions
  • Design and engineering of the new deck
  • Removal of the existing deck structure
  • Construction and installation of the new deck
  • Quality assurance and compliance checks
Response package checklist
  • Completed proposal form
  • Project experience documentation
  • Financial capability statement
  • Technical approach and methodology
  • Bid price and breakdown
  • Disadvantaged business participation plan
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Adhere to SBPP eligibility requirements
  • Ensure compliance with state and federal regulations for construction projects
  • Include all necessary licenses and certifications
Pricing strategy
  • Consider competitive pricing while maintaining quality standards
  • Analyze existing contracts for benchmarks
  • Incorporate costs for materials, labor, and overhead
Teaming and subs
  • Consider partnerships with local subcontractors for labor
  • Engage specialists for specific engineering tasks
  • Look for joint ventures with other small businesses to enhance capabilities
Risks and watchouts
  • Potential delays in obtaining permits
  • Fluctuating material costs affecting budget
  • Compliance risks with regulations impacting project timeline
Smart questions to ask
  • What are the specific compliance requirements for SBPP participation?
  • Are there any historical challenges faced in similar previous projects?
  • What are the expectations for quality assurance and post-construction evaluations?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Details on existing deck conditions
  • Project budget range
  • Specific engineering requirements
  • Need for environmental assessments
  • Previous contractors' performance reviews
  • Any potential site-specific challenges
  • Clarification on the bidding platform
  • Further details on the solicitation number

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.