Skip to content
City of Springfield

26-177 Bleacher Installation at Duggan Middle School

Solicitation: Not available
Notice ID: ma_commbuys_ab35148d0687b97d6880
NAICS 30, 23, 15DepartmentCity of SpringfieldAgencyPUR02 - ProcurementStateMAPostedDueMay 06, 2026, 02:00 PM UTCCloses in 19 days

Federal opportunity from PUR02 - Procurement • City of Springfield. Place of performance: MA. Response deadline: May 06, 2026. Industry: NAICS 30, 23, 15.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,706,841,172
Sector total $2,706,841,172 • Share 100.0%
Live
Median
$318,072
P10–P90
$42,300$2,065,904
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,706,841,172)
Deal sizing
$318,072 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Map for MA
Live POP
Place of performance
Lauren Stabilo 36 Court Street - Room 307 Springfield, MA 01103 US Email: lstabilo@springfieldcityhall.com Phone: (413) 787-6284 FAX: (413) 787-6295
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260001 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems (ZONE A)
Base $55.45Fringe $36.63
Rate
ZONE B)
Base $55.45Fringe $36.63
+97 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 97 more rate previews.
Davis-BaconBest fitstate match
MA20260001 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems (ZONE A)
Base $55.45Fringe $36.63
Rate
ZONE B)
Base $55.45Fringe $36.63
Rate
ATERIAL HANDLER (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)
Base $55.45Fringe $36.63
+96 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Plymouth
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260020 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Springfield
Agency
PUR02 - Procurement
Subagency
PUR02 - Procurement
Office
Antonio D'Angelo
Contracting Office Address
Not available

Description

The City of Springfield is seeking bids from qualified firms to enter into an agreement to provide Bleacher Installation at Duggan Middle School, 1015 Wilbraham Rd, Springfield, MA 01109. This bid falls under M.G.L. Ch. 149 and other procurement statutes. Estimated value of the contract is approximately $60,000.00.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 18, 2026
Client-ready brief
Executive summary
high confidencegpt 4o mini

The City of Springfield is soliciting bids for the installation of bleachers at Duggan Middle School, with an estimated contract value of $60,000. The project is regulated under M.G.L. Ch. 149 and related statutes. Interested firms must demonstrate qualification to handle installations of this nature.

Bleacher installationSchool facilitiesM.G.L. Ch. 149Springfield MAConstruction bidding
What the buyer is trying to do

The buyer aims to select a qualified contractor for the bleacher installation to enhance the facilities at Duggan Middle School.

Who should pursue this
  • Contractors specialized in bleacher installations
  • Firms with experience in school facility improvements
  • Companies compliant with M.G.L. Ch. 149 guidelines
Work breakdown
  • Site preparation for bleacher installation
  • Provision of materials required for bleacher structure
  • Installation of bleachers at designated location
  • Post-installation inspection and compliance check
Response package checklist
  • Bid proposal including project timeline
  • Cost breakdown and pricing strategy
  • Proof of relevant qualifications and past project examples
  • Compliance with M.G.L. Ch. 149
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Adherence to Massachusetts General Laws Chapter 149 is required
  • Compliance with local regulations concerning school facilities
Pricing strategy
  • Proposals should reflect the estimated value of $60,000
  • Consider potential contingencies in pricing
Teaming and subs
  • Possibility to partner with subcontractors who specialize in construction
  • Engagement with local suppliers for materials
Risks and watchouts
  • Underestimating costs could lead to financial loss
  • Delays in installation could impact school schedules
  • Compliance violations could disqualify bids
Smart questions to ask
  • What are the specific compliance requirements under M.G.L. Ch. 149?
  • Are there any unique site conditions at Duggan Middle School?
  • What is the expected timeline for the installation process?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Exact scope details of the bleacher installation
  • Response deadlines for bid submissions
  • Specific qualifications needed from contractors
  • Information on site conditions at Duggan Middle School

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.