Skip to content
City of Springfield

26-121: Hiram L. Dorman Elementary School AC Upgrades

Solicitation: Not available
Notice ID: ma_commbuys_50af7d91b3486dc26bf7
NAICS 72, 15, 12DepartmentCity of SpringfieldAgencyPUR02 - ProcurementStateMAPostedDueApr 22, 2026, 02:00 PM UTCCloses in 5 days

Federal opportunity from PUR02 - Procurement • City of Springfield. Place of performance: MA. Response deadline: Apr 22, 2026. Industry: NAICS 72, 15, 12.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,275,750,127
Sector total $2,275,750,127 • Share 100.0%
Live
Median
$146,315
P10–P90
$27,574$1,433,570
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,275,750,127)
Deal sizing
$146,315 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Map for MA
Live POP
Place of performance
Lauren Stabilo 36 Court Street - Room 307 Springfield, MA 01103 US Email: lstabilo@springfieldcityhall.com Phone: (413) 787-6284 FAX: (413) 787-6295
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260001 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems (ZONE A)
Base $55.45Fringe $36.63
Rate
ZONE B)
Base $55.45Fringe $36.63
+97 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 97 more rate previews.
Davis-BaconBest fitstate match
MA20260001 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems (ZONE A)
Base $55.45Fringe $36.63
Rate
ZONE B)
Base $55.45Fringe $36.63
Rate
ATERIAL HANDLER (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)
Base $55.45Fringe $36.63
+96 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Plymouth
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260020 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Springfield
Agency
PUR02 - Procurement
Subagency
PUR02 - Procurement
Office
Neil Walker
Contracting Office Address
Not available

Description

Air conditioning upgrades to existing classrooms.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 18, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The opportunity involves air conditioning upgrades for existing classrooms at Hiram L. Dorman Elementary School. The response deadline for this bid is April 22, 2026. This project requires expertise in HVAC systems and is part of the PUR02 - Procurement agency's initiatives to enhance educational environments.

HVAC upgradesair conditioning installationeducational facility improvementsmechanical systemsenvironmental comfort
What the buyer is trying to do

The buyer aims to modernize and improve the air conditioning systems in classrooms to ensure better comfort and learning conditions for students.

Who should pursue this
  • HVAC contractors
  • Mechanical engineering firms
  • Construction companies with HVAC experience
Work breakdown
  • Site assessment of existing HVAC systems
  • Design specifications for upgraded AC units
  • Installation of new air conditioning units
  • Post-installation review and testing of systems
Response package checklist
  • Technical proposal detailing approach and methodologies
  • Cost estimate and pricing breakdown
  • Qualifications and previous experience
  • Timeline for project completion
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Adhere to local building codes and regulations
  • Ensure compliance with safety standards for school environments
Pricing strategy
  • Competitive pricing based on market rates for HVAC upgrades
  • Consider lifecycle costs and energy efficiency ratings in proposals
Teaming and subs
  • Form partnerships with local HVAC suppliers
  • Collaborate with licensed electricians for electrical upgrades required
Risks and watchouts
  • Potential delays due to procurement of specialized equipment
  • Disruptions to school operations during installation
  • Compliance issues with local regulations
Smart questions to ask
  • What is the timeline for site access and inspections?
  • Are there specific energy efficiency standards required for the new systems?
  • What is the budget range allocated for this project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed specifications for the air conditioning units
  • Invoices or budgeting information
  • Previous projects of similar nature
  • Responses to questions about school scheduling around construction
  • Local climate considerations that may affect AC requirements

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.