CITYWIDE ROADWAY AND SIDEWALK RECONSTRUCTION SERVICES
Federal opportunity from COM01 - Public Works • City of Melrose. Place of performance: MA. Response deadline: Mar 19, 2026. Industry: NAICS 30, 12, 00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 61 more rate previews.↓
Point of Contact
Agency & Office
Description
The Scope of Work shall include on-call services for mill and overlay, pavement reclamation, pavement leveling, installation of stress absorbing membrane (SAM), crack sealing, remove and reset granite curb, furnish and install granite curb, install bituminous curb and sidewalk, install concrete sidewalk and ADA ramps, and all associated work. The locations and quantities of specific roadway and sidewalk work is subject to change.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Citywide Roadway and Sidewalk Reconstruction Services opportunity offers an extensive scope of work under the COM01 - Public Works agency. Key services include mill and overlay, crack sealing, and installation of ADA ramps, with a response deadline of March 19, 2026. The nature of this work allows for flexibility in project locations and quantities based on city needs.
The buyer is seeking qualified contractors to provide on-call reconstruction services for roadways and sidewalks, ensuring compliance with ADA standards and enhancing community infrastructure.
- Construction firms specializing in roadway and sidewalk projects
- Companies with experience in ADA compliance installations
- Local contractors with a history of municipal projects
- Mill and overlay services
- Pavement reclamation and leveling
- Installation of stress absorbing membrane (SAM)
- Crack sealing
- Remove and reset granite curb
- Furnish and install granite curb
- Install bituminous curb and sidewalk
- Install concrete sidewalk and ADA ramps
- Associated ancillary work
- Company qualifications and past performance
- Cost estimation for services outlined
- Evidence of ADA compliance capabilities
- Staffing plan including key personnel
- Scheduling plan for on-call services
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure all work meets local and federal ADA regulations
- Compliance with city engineering standards and specifications
- Adherence to all safety regulations during construction
- Consider competitive pricing based on typical municipal contracts
- Include scalable pricing options based on volume of work
- Factor in time-sensitive pricing adjustments for on-call services
- Engage subcontractors specialized in concrete work and curb installation
- Consider teaming with local suppliers for materials
- Partner with firms that have strong safety records and compliance
- Potential for delays due to weather affecting scheduling
- Changes in project scope impacting cost and timelines
- Increased scrutiny on ADA compliance and related inspections
- What are the typical response times expected on on-call services?
- Can we obtain detailed maps of work areas to assess site conditions?
- What processes are in place for handling unexpected changes in work scope?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed cost estimates
- Exact locations of anticipated work
- Timelines for individual project phases
- Specific performance metrics for contractors
- Identification of city engineering standards relevant to the project
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.