IFB: Barrett Park Pond Dam Rehabilitation
Federal opportunity from 001 - Office of the Purchasing Agent • City of Leominster. Place of performance: MA. Response deadline: Apr 23, 2026. Industry: NAICS 70, 17, 00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 61 more rate previews.↓
Point of Contact
Agency & Office
Description
Specifications for the above proposal required by the Office of the Mayor may be obtained at the Office of the Purchasing Agent, 25 West St., Leominster, MA 01453, or by calling 978-962-3537. IFB documents may also be downloaded at www.leominster-ma.gov on the Active Bids link under the Purchasing Page.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The opportunity involves the IFB for Barrett Park Pond Dam Rehabilitation as issued by the Office of the Purchasing Agent in Leominster, MA. Interested bidders can access the specifications at the Office of the Mayor or download IFB documents online. The response deadline is set for April 23, 2026, which gives potential bidders ample time to prepare their submissions.
The buyer is seeking qualified contractors to rehabilitate the Barrett Park Pond Dam, which likely includes structural repairs and ensuring safety standards are met.
- Contractors with experience in dam rehabilitation
- Civil engineering firms with relevant credentials
- Local contractors familiar with Leominster regulations
- Review and obtain project specifications
- Conduct site assessments
- Prepare detailed proposals including project plans and timelines
- Submit bids by the deadline
- Completed bid form
- Proof of qualifications and experience
- Compliance with safety regulations
- Detailed pricing structure and timeline
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure all proposals meet the guidelines provided in the IFB documents
- Adhere to local regulations regarding dam rehabilitation
- Consider competitive pricing based on local market analysis
- Identify potential cost savings through efficient project planning
- Partner with environmental engineers for compliance assessments
- Include subcontractors who specialize in public works projects
- Potential delays in obtaining required permits
- Variability in materials costs could affect pricing
- What are the specific rehabilitation requirements outlined in the IFB?
- Are there any environmental assessments required prior to starting the project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific details in the IFB documentation regarding scope and requirements
- Exact specifications and drawings for the dam rehabilitation
- Clarification on whether pre-bid meetings will be held
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.