Skip to content
Boston Water & Sewer Commission

Fort Point Channel and Dorchester Bay Basin Adaptation Design Advancement

Solicitation: Not available
Notice ID: ma_commbuys_6c5fd72090e24bcf89fa
NAICS 81, 10, 00DepartmentBoston Water & Sewer CommissionAgencyBWSC1 - Boston Water & Sewer CommissionStateMAPostedDueMay 01, 2026, 12:00 PM UTCCloses in 23 days

Federal opportunity from BWSC1 - Boston Water & Sewer Commission • Boston Water & Sewer Commission. Place of performance: MA. Response deadline: May 01, 2026. Industry: NAICS 81, 10, 00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,752,078,526
Sector total $1,752,078,526 • Share 100.0%
Live
Median
$159,094
P10–P90
$28,991$1,736,867
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,752,078,526)
Deal sizing
$159,094 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Maria J. Gomes 980 Harrison Ave Boston, MA 02119 US Email: gomesmj@bwsc.org Phone: (617) 989-7383 FAX: (617) 989-7730
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260003 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
+61 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 61 more rate previews.
Davis-BaconBest fitstate match
MA20260003 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+60 more occupation rates in this WD
Davis-Baconstate match
MA20260009 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Dukes, Nantucket
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
Marble & Tile Finisher
Base $49.32Fringe $35.26
Rate
Marble, Tile & Terrazzo Workers
Base $64.52Fringe $37.51
+45 more occupation rates in this WD
Davis-Baconstate match
MA20260020 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Boston Water & Sewer Commission
Agency
BWSC1 - Boston Water & Sewer Commission
Subagency
BWSC1 - Boston Water & Sewer Commission
Office
STEPHANIE HARRIS
Contracting Office Address
Not available

Description

Fort Point Channel and Dorchester Bay Basin Adaptation Design Advancement

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 02, 2026
Client-ready brief
Executive summary
medium confidencelocal fallback

BWSC1 - Boston Water & Sewer Commission issued solicitation Fort Point Channel and Dorchester Bay Basin Adaptation Design Advancement, with NAICS 81, 10, 00. Fort Point Channel and Dorchester Bay Basin Adaptation Design Advancement Review the linked source materials to confirm final scope, submission mechanics, and buyer instructions.

Fort Point Channel and Dorchester Bay Basin Adaptation Design AdvancementBWSC1 - Boston Water & Sewer Commission811000
What the buyer is trying to do

Fort Point Channel and Dorchester Bay Basin Adaptation Design Advancement

Who should pursue this
  • Solicitation contractors with direct experience delivering comparable work for public buyers.
  • Teams aligned to NAICS 81, 10, 00.
Work breakdown
  • Fort Point Channel and Dorchester Bay Basin Adaptation Design Advancement
Response package checklist
  • Download and review all official solicitation documents and addenda.
  • Confirm submission format, due date, and delivery method with the buyer portal or notice.
  • Prepare pricing, scope response, and required forms/certifications.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Notice aligns to NAICS 81, 10, 00.
  • Validate insurance, licensing, and any site-access requirements in the official documents.
Pricing strategy
  • Price to the actual scope and staffing assumptions in the official documents.
  • Watch for multi-site, overtime, after-hours, mobilization, or equipment cost drivers.
  • Confirm whether the buyer expects all-inclusive pricing, line items, or optional services.
Teaming and subs
  • Use subs or teaming partners if specialized staffing, equipment, or local coverage is required.
  • Align subcontract scopes to compliance-sensitive work and document responsibilities clearly.
Risks and watchouts
  • Due date is May 1, 2026; verify exact due time and timezone.
  • Attachment coverage is limited in the current record; check the source portal directly.
  • Do not assume unstated requirements, contract duration, or evaluation factors.
Smart questions to ask
  • Are there mandatory site visits, staffing minimums, or licensing requirements?
  • What exact documents and forms must be submitted at bid time?
  • Are there incumbent, transition, or performance-reporting requirements not obvious from the summary?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Set-aside status is not confirmed.
  • Contracting office/contact is not clearly identified.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.