Emergency Final Costs Deerfield Removal and Repair of Failed Dewatering Pumps Marker 56
Federal opportunity from PROCURE557 - Procurement • THA - Toll Highway Authority. Place of performance: IL. Response deadline: Sep 04, 2025.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Emergency Final Costs Deerfield Removal and Repair of Failed Dewatering Pumps Marker 56 Item # 1: ( 910 - 60 ) Emergency Contract for Deerfield Removal and Repair of Failed Dewatering Pumps at Marker 56 from 5/6/2025 to 8/3/2025 per attached Emergency Purchase Statement. Emergency Contract for Deerfield Removal and Repair of Failed Dewatering Pumps at Marker 56 from 5/6/2025 to 8/3/2025 per attached Emergency Purchase Statement.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.