RR-23-4920R IL Route 390 Tollway between MP 6.0(US 20/Lake St) to MP 13.0(I-290/Eisenhower EXpwy)
Federal opportunity from ENGCONSTRUCT557 - Engineering - Construction • THA - Toll Highway Authority. Place of performance: IL. Response deadline: Oct 24, 2025.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
RR-23-4920R IL Route 390 Tollway between MP 6.0(US 20/Lake St) to MP 13.0(I-290/Eisenhower EXpwy) Request for Qualifications (RFQ) for Design Build Contract RR-23-4920R Pavement and Structural Rehabilitation Illinois Route 390 M.P. 6.0 (U.S. Route 20/Lake Street) to M.P. 13.0 (I-290). Pursuant to CPO Notice 2023.12, State agencies shall only accept electronic submissions for competitive solicitations. Paper responses will not be accepted. For more details, please see the attachment titled cpo-notice-2023.12 electronic-submission. See attached RFQ for required documents. Item # 1: ( 912 - 00 ) Pavement and Structural Rehabilitation Illinois Route 390- M.P. 6.0 (U.S. Route 20/Lake Street to M.P. 13.0 (I-290) Pavement and Structural Rehabilitation Illinois Route 390- M.P. 6.0 (U.S. Route 20/Lake Street to M.P. 13.0 (I-290)
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.