Emergency Final Cost Pavement and Patch Work
Federal opportunity from ENGCONSTRUCT557 - Engineering - Construction • THA - Toll Highway Authority. Place of performance: IL. Response deadline: Jul 22, 2025.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Emergency Final Cost Pavement and Patch Work Item # 1: ( 913 - 95 ) Emergency Contract for Pavement and Patching Work from 6/14/2024 to 9/11/2024 per attached Emergency Purchase Statement. Emergency Contract for Pavement and Patching Work from 6/14/2024 to 9/11/2024 per attached Emergency Purchase Statement.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.