Skip to content
SOS - Secretary of State

Change Order Notice - Horizontech

Solicitation: Not available
Notice ID: 25-350SOS-VEHSE-B-45029

Federal opportunity from VEHSER350 - Vehicle Services • SOS - Secretary of State. Place of performance: IL. Response deadline: Oct 18, 2024.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$659,327,406
Sector total $659,327,406 • Share 100.0%
Live
Median
$157,798
P10–P90
$29,611$1,830,899
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($659,327,406)
Deal sizing
$157,798 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for IL
Live POP
Place of performance
Illinois Secretary of State 501 South 2nd Street 116 Howlett Building Springfield, IL 62756 US Email: procurement@ilsos.gov Phone: (217) 782-7198
State: IL
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
SOS - Secretary of State
Agency
VEHSER350 - Vehicle Services
Subagency
VEHSER350 - Vehicle Services
Office
AF001 - Vehicle Services
Contracting Office Address
Not available

Description

Change Order Notice - Horizontech ILSOS is entering into a change order with Horizontech in the amount of $96,684.40 for data entry and imaging. The original contract was estimated. This change order is germane to the original contract. Item # 1: ( 920 - 22 ) ILSOS is entering into a change order with Horizontech in the amount of $96,684.40 for data entry and imaging. ILSOS is entering into a change order with Horizontech in the amount of $96,684.40 for data entry and imaging.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.