Skip to content
SOS - Secretary of State

Change Order Notice: UPS Battery Maintenance Inspection

Solicitation: Not available
Notice ID: 25-350SOS-ITSOS-B-45144

Federal opportunity from ITSOS350 - Information Technology • SOS - Secretary of State. Place of performance: IL. Response deadline: Oct 29, 2024.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$659,327,406
Sector total $659,327,406 • Share 100.0%
Live
Median
$157,798
P10–P90
$29,611$1,830,899
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($659,327,406)
Deal sizing
$157,798 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for IL
Live POP
Place of performance
Illinois Secretary of State 501 South 2nd Street 116 Howlett Building Springfield, IL 62756 US Email: procurement@ilsos.gov Phone: (217) 782-7198
State: IL
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
SOS - Secretary of State
Agency
ITSOS350 - Information Technology
Subagency
ITSOS350 - Information Technology
Office
AB001 - Information Technology
Contracting Office Address
Not available

Description

Change Order Notice: UPS Battery Maintenance Inspection The Illinois Secretary of State's Office is entering into a change order with EOLA Power for the replacement of UPS batteries, fans, and capacitors at Howlett and Dirksen for $98,302.76. The change order is germane to the original contract and not reasonably foreseeable at the time of contract execution. Item # 1: ( 285 - 04 ) The Illinois Secretary of State's Office is entering into a change order with EOLA Power for the replacement of UPS batteries, fans, and capacitors at Howlett and Dirksen for $98,302.76. The change order is germane to the original contract and not reasonably foreseeable at the time of contract execution.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.