Skip to content
EPA - Environmental Protection Agency

WSP CHANGE ORDER NOTICE

Solicitation: Not available
Notice ID: 26-532EPA-FISCP-B-50355

Federal opportunity from FISCPROC532 - Fiscal / Procurement • EPA - Environmental Protection Agency. Place of performance: IL. Response deadline: Dec 26, 2025.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$546,655,675
Sector total $546,655,675 • Share 100.0%
Live
Median
$97,181
P10–P90
$33,967$992,402
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($546,655,675)
Deal sizing
$97,181 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for IL
Live POP
Place of performance
Land Administration 2520 W Isles Avenue Springfield, IL 62704 US Email: donotreply@illinois.gov Phone: (000) 000-0000
State: IL
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
EPA - Environmental Protection Agency
Agency
FISCPROC532 - Fiscal / Procurement
Subagency
FISCPROC532 - Fiscal / Procurement
Office
AE001 - Fiscal
Contracting Office Address
Not available

Description

WSP CHANGE ORDER NOTICE The business need is currently being met by the existing contract. This request is for a contract extension to allow completion of certain tasks and completion of a new task. The existing contract ends December 31, 2025 (for a total of 39 months, including one previous extension). The original contract was bid as a Quality Based Selection. Procurement is not subject to Small Business Set Aside, BEP, or Veteran's Business Program. IPB number: 21-532EPA--LANDS-B-21264. Item # 1: ( 918 - 43 ) The vendor has been scoped to complete six tasks as listed in the contract, two are completed optimization of well network, preliminary-assessment), three are almost completed, but need revisions before final acceptance Institutional Control Plan, Long Term Stewardship Plan and Groundwater Management Zone, and one task is in its last phase and requires additional review and modification before completion. The vendor has been scoped to complete six tasks as listed in the contract, two are completed optimization of well network, preliminary-assessment), three are almost completed, but need revisions before final acceptance Institutional Control Plan, Long Term Stewardship Plan and Groundwater Management Zone, and one task is in its last phase and requires additional review and modification before completion.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.