KM EMA - GEMS Air Compressor Maintenance
Federal opportunity from MGMTADMIN588 - Management and Administration • EMA - Emergency Management Agency. Place of performance: IL. Response deadline: Jun 26, 2025.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
KM EMA - GEMS Air Compressor Maintenance Item # 1: ( 936 - 08 ) Annual Preventive Maintenance of the Kaeser Model SX5T Rotary Screw Air Compressor located at the Braidwood Generating Station, 35100 S Route 53 Braceville, IL 60407 - FY26 (July 1, 2025 - June 30, 2026) - (See Attachment A). Annual Preventive Maintenance of the Kaeser Model SX5T Rotary Screw Air Compressor located at the Braidwood Generating Station, 35100 S Route 53 Braceville, IL 60407 - FY26 (July 1, 2025 - June 30, 2026) - (See Attachment A). Item # 2: ( 936 - 08 ) Annual Preventive Maintenance of the Kaeser Model SX5T Rotary Screw Air Compressor located at the Braidwood Generating Station, 35100 S Route 53 Braceville, IL 60407 - FY27 (July 1, 2026 - June 30, 2027) - (See Attachment A). Annual Preventive Maintenance of the Kaeser Model SX5T Rotary Screw Air Compressor located at the Braidwood Generating Station, 35100 S Route 53 Braceville, IL 60407 - FY27 (July 1, 2026 - June 30, 2027) - (See Attachment A). Item # 3: ( 936 - 08 ) Annual Preventive Maintenance of the Kaeser Model SX5T Rotary Screw Air Compressor located at the Byron Power Plant, 4450 N German Church Rd Byron,IL 61010 - FY26 (July 1, 2025 - June 30, 2026) - (See Attachment A). Annual Preventive Maintenance of the Kaeser Model SX5T Rotary Screw Air Compressor located at the Byron Power Plant, 4450 N German Church Rd Byron,IL 61010 - FY26 (July 1, 2025 - June 30, 2026) - (See Attachment A). Item # 4: ( 936 - 08 ) Annual Preventive Maintenance of the Kaeser Model SX5T Rotary Screw Air Compressor located at the Byron Power Plant, 4450 N German Church Rd Byron,IL 61010 - FY27 (July 1, 2026 - June 30, 2027) - (See Attachment A). Annual Preventive Maintenance of the Kaeser Model SX5T Rotary Screw Air Compressor located at the Byron Power Plant, 4450 N German Church Rd Byron,IL 61010 - FY27 (July 1, 2026 - June 30, 2027) - (See Attachment A). Item # 5: ( 936 - 08 ) Annual Preventive Maintenance of the Kaeser Model SX5T Rotary Screw Air Compressor located at the Clinton Power Plant, 8401 Power Rd Clinton, IL 61727 - FY26 (July 1, 2025 - June 30, 2026) - (See Attachment A). Annual Preventive Maintenance of the Kaeser Model SX5T Rotary Screw Air Compressor located at the Clinton Power Plant, 8401 Power Rd Clinton, IL 61727 - FY26 (July 1, 2025 - June 30, 2026) - (See Attachment A).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.