D8 Extended Box Culvert
Federal opportunity from FINADMIN494 - Finance & Administration • DOT - Transportation. Place of performance: IL. Response deadline: Aug 13, 2024.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
D8 Extended Box Culvert
Item # 1: ( 210 - 28 ) Option A: 43"x68" HE-III RCP Mastic Joint. Cost per linear foot.
Option A: 43"x68" HE-III RCP Mastic Joint. Cost per linear foot.
Item # 2: ( 210 - 28 ) Option A: 43" x 68" HE Standard Concrete Flared End Section
Option A: 43" x 68" HE Standard Concrete Flared End Section
Item # 3: ( 210 - 28 ) Option B: 5' x 3' ASTM C-1577 PCBC - 40 linear feet. Cost per linear foot.
Option B: 5' x 3' ASTM C-1577 PCBC - 40 linear feet. Cost per linear foot.
Item # 4: ( 210 - 28 ) Option B: ASTM C1557-20 End Section
Option B: ASTM C1557-20 End Section
Item # 5: ( 210 - 28 ) Option B: 12" x 50' Rolls of Joint Wrap - cost per roll
Option B: 12" x 50' Rolls of Joint Wrap - cost per roll
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.