Skip to content
Department of Transportation

D7 Fire Panel - Critical Infrastructure

Solicitation: Not available
Notice ID: 24-494DOT-FINAD-B-41692

Federal opportunity from FINADMIN494 - Finance & Administration • DOT - Transportation. Place of performance: IL. Response deadline: Feb 29, 2024.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$68,699,272,131
Sector total $68,699,272,131 • Share 100.0%
Live
Median
$253,715
P10–P90
$29,763$10,909,709
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($68,699,272,131)
Deal sizing
$253,715 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for IL
Live POP
Place of performance
Randy Blackford 400 W. Wabash Avenue Effingham, IL 62401 US Email: randy.blackford@illinois.gov Phone: (217) 342-8214
State: IL
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
DOT - Transportation
Agency
FINADMIN494 - Finance & Administration
Subagency
FINADMIN494 - Finance & Administration
Office
AK002 - Business Services
Contracting Office Address
Not available

Description

D7 Fire Panel - Critical Infrastructure

Item # 1: ( 340 - 00 ) Full and complete fire panel replacement which includes all devices; intelligent power expander, photo detector, detector base, point addressable fire panel, lcd remote annunciator red enclosure, heat detector, duct detector with relay, addressable pull station dual action, input module, relay module, wall selectable horn/strobe - red, power supplies, panel cabling, and any other device needed for a functioning system under NFPA standards. Attached are Exhibit 1, Exhibit 2, and Exhibit 3 which will assist in the estimated number of devices currently installed and needing replaced. Currently installed fire devices are ESTIMATED and all devices that are currently installed will need to be replaced so that existing fire protection coverage is the same after update. *The new system needs to function and cover the exact same area we currently monitor. There are 3 buildings within the main campus offices. Headquarters buildings, Annex, and Operations buildings. Attached are floorplans with panel and door locations. IDOT District 7 Headquarters, 400 West Wabash Avenue, Effingham, IL 62401

Full and complete fire panel replacement which includes all devices; intelligent power expander, photo detector, detector base, point addressable fire panel, lcd remote annunciator red enclosure, heat detector, duct detector with relay, addressable pull station dual action, input module, relay module, wall selectable horn/strobe - red, power supplies, panel cabling, and any other device needed for a functioning system under NFPA standards. Attached are Exhibit 1, Exhibit 2, and Exhibit 3 which will assist in the estimated number of devices currently installed and needing replaced. Currently installed fire devices are ESTIMATED and all devices that are currently installed will need to be replaced so that existing fire protection coverage is the same after update. *The new system needs to function and cover the exact same area we currently monitor. There are 3 buildings within the main campus offices. Headquarters buildings, Annex, and Operations buildings. Attached are floorplans with panel and door locations. IDOT District 7 Headquarters, 400 West Wabash Avenue, Effingham, IL 62401

Item # 2: ( 340 - 00 ) Necessary Hardware, Cabling, and Equipment to install Magnet Hold Opens on existing Fire Doors in 22 locations. Necessary Hardware to include. Wall mount magnets for magnetic door hold opens, door mount plate and bar for magnetic door hold opens, electrical relays to properly operate and control magnetic door hold opens, and power supplies to operate and control magnetic door hold opens. Will need to connect to main fire panel or Extender panel in outer buildings on campus. Hardware is to be mounted to the door and the wall. Run Wiring to power supplies and magnetic door hold open control panels so that the magnets will release and the doors automatically close in a fire event on fire panel.

Necessary Hardware, Cabling, and Equipment to install Magnet Hold Opens on existing Fire Doors in 22 locations. Necessary Hardware to include. Wall mount magnets for magnetic door hold opens, door mount plate and bar for magnetic door hold opens, electrical relays to properly operate and control magnetic door hold opens, and power supplies to operate and control magnetic door hold opens. Will need to connect to main fire panel or Extender panel in outer buildings on campus. Hardware is to be mounted to the door and the wall. Run Wiring to power supplies and magnetic door hold open control panels so that the magnets will release and the doors automatically close in a fire event on fire panel.

Item # 3: ( 340 - 00 ) Hardware, cabling, and equipment to install 4 Heat Detectors and 2 pull stations in Mechanic Maintenance Garage and Office. This is currently monitored on the panel and is attached to the same building the main panel is in. Will be a separate NAC-Node on the panel. Run necessary wiring to equipment so that the new devices will operate properly on fire panel system. Necessary Wiring to meet or exceed NFPA and NEC standards and are currently specked at 14/2 red non-plenum shielded cabling for this location. The Maintenance Garage is an open ceiling, block wall metal hoop structure and all devices will be surface mounted to the block wall or the metal trusses of building. The office space has a drop ceiling and framed walls. Devices will be mounted to wall or to drop ceiling. All mounting hardware, conduit, electrical boxes, mud rings, and fasteners will be provided and installed so devices are mounted securely in all locations.

Hardware, cabling, and equipment to install 4 Heat Detectors and 2 pull stations in Mechanic Maintenance Garage and Office. This is currently monitored on the panel and is attached to the same building the main panel is in. Will be a separate NAC-Node on the panel. Run necessary wiring to equipment so that the new devices will operate properly on fire panel system. Necessary Wiring to meet or exceed NFPA and NEC standards and are currently specked at 14/2 red non-plenum shielded cabling for this location. The Maintenance Garage is an open ceiling, block wall metal hoop structure and all devices will be surface mounted to the block wall or the metal trusses of building. The office space has a drop ceiling and framed walls. Devices will be mounted to wall or to drop ceiling. All mounting hardware, conduit, electrical boxes, mud rings, and fasteners will be provided and installed so devices are mounted securely in all locations.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.