IDOC BMR Pneumatic System Air Compressors CLS
Federal opportunity from MUDDYRIVER426 - Big Muddy River Correctional Center • DOC - Corrections. Place of performance: IL. Response deadline: Jan 20, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
IDOC BMR Pneumatic System Air Compressors CLS Big Muddy River Correctional Center is seeking a vendor to remove and replace the air compressors in the pneumatic building automation system in four housing units and the dietary building. Item # 1: Big Muddy River Correctional Center is seeking a vendor to replace the air compressors and corresponding components in the Siemens Building Automation Systems. Air compressors and components are to be replaced in four housing units and the dietary building for a total of five air compressor units and corresponding components. Line items to be completed are for total labor cost in line item one and total material costs in line item two. Big Muddy River Correctional Center is seeking a vendor to replace the air compressors and corresponding components in the Siemens Building Automation Systems. Air compressors and components are to be replaced in four housing units and the dietary building for a total of five air compressor units and corresponding components. Line items to be completed are for total labor cost in line item one and total material costs in line item two. Item # 2: ( 025 - 43 ) Total labor cost to remove and then replace / install five air compressors and corresponding components, one each to the four housing units and one to the dietary building automation systems. Total labor cost to remove and then replace / install five air compressors and corresponding components, one each to the four housing units and one to the dietary building automation systems. Item # 3: ( 025 - 43 ) Total material costs to replace and install five air compressors and corresponding components, one each to the four housing units and one to the dietary building automation systems. Total material costs to replace and install five air compressors and corresponding components, one each to the four housing units and one to the dietary building automation systems.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.