Skip to content
DOC - Corrections

IDOC - BMR - Building Automation System 1-Year Contract SP w SSC - JF

Solicitation: Not available
Notice ID: 26-426DOC-MUDDY-B-50195

Federal opportunity from MUDDYRIVER426 - Big Muddy River Correctional Center • DOC - Corrections. Place of performance: IL. Response deadline: Dec 12, 2025.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$561,809,589
Sector total $561,809,589 • Share 100.0%
Live
Median
$104,780
P10–P90
$36,558$1,117,129
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($561,809,589)
Deal sizing
$104,780 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for IL
Live POP
Place of performance
Business Administrator 251 N. Illinois Hwy 37 Ina, IL 62846 US Email: DOC.BigMuddy.BusinessOffice@illinois.gov Phone: (618) 437-5300 Ext. 242
State: IL
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
DOC - Corrections
Agency
MUDDYRIVER426 - Big Muddy River Correctional Center
Subagency
MUDDYRIVER426 - Big Muddy River Correctional Center
Office
BB001 - Big Muddy River Correctional Center
Contracting Office Address
Not available

Description

IDOC - BMR - Building Automation System 1-Year Contract SP w SSC - JF Big Muddy River Correctional Center seeks to procure a contract with Sole Sourche vendor to provide inspections/service to include parts, repairs, and preventative maintenance to the Building Automation System on a scheduled as needed basis. Item # 1: ( 031 - 26 ) Initial Term Year One (1) Sole source conditions for a Siemens proprietary building automation system. all materials provided shall be new, unless otherwise stipulated, and compliant with applicable manufacturer's specifications. Replacement parts and other materials may be billed by the Vendor. Initial Term Year One (1) Sole source conditions for a Siemens proprietary building automation system. all materials provided shall be new, unless otherwise stipulated, and compliant with applicable manufacturer's specifications. Replacement parts and other materials may be billed by the Vendor. Item # 2: ( 031 - 26 ) Initial Term Year One (1) - Siemen's Specialist Preventative Maintenance of facility building automation system. Unit of measure will be based on 6 visits at 8 hours per visit . This will be an annual estimate of time for Siemens Specialist Preventative maintenance. Sole source conditions-Siemens proprietary to the building automation system. 6 times per year. Initial Term Year One (1) - Siemen's Specialist Preventative Maintenance of facility building automation system. Unit of measure will be based on 6 visits at 8 hours per visit . This will be an annual estimate of time for Siemens Specialist Preventative maintenance. Sole source conditions-Siemens proprietary to the building automation system. 6 times per year. Item # 3: ( 031 - 26 ) Initial Term Year One (1) -Mechanic Preventative Maintenance of facility building automation system. Unit of measure will be based on 4 visits at 8 hours per visit. This will be an annual estimate of time for Mechanic Preventative maintenance. Sole source conditions-Siemens proprietary building automation system. 4 times per year. Initial Term Year One (1) -Mechanic Preventative Maintenance of facility building automation system. Unit of measure will be based on 4 visits at 8 hours per visit. This will be an annual estimate of time for Mechanic Preventative maintenance. Sole source conditions-Siemens proprietary building automation system. 4 times per year. Item # 4: ( 031 - 26 ) Initial Term Year One (1) - Software/firmware maintenance. Unit of measure will be based on 2 visits at 8 hours per visit. This will be an annual estimate for Building Automation Software/Firmware Maintenance. Sole source conditions-Siemens proprietary building automation system. 2 times per year. Initial Term Year One (1) - Software/firmware maintenance. Unit of measure will be based on 2 visits at 8 hours per visit. This will be an annual estimate for Building Automation Software/Firmware Maintenance. Sole source conditions-Siemens proprietary building automation system. 2 times per year. Item # 5: ( 031 - 26 ) Initial Term Year One (1) - Overtime hourly rate for maintenance of facility building automation system. Unit of measure will be hourly and the number will be an annual estimation of hours. Approximately 8 hours annually. Sole source conditions-Siemens proprietary building automation system. Initial Term Year One (1) - Overtime hourly rate for maintenance of facility building automation system. Unit of measure will be hourly and the number will be an annual estimation of hours. Approximately 8 hours annually. Sole source conditions-Siemens proprietary building automation system.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.