FY26 CLEARVIEW PROTECTIVE FABRIC
Federal opportunity from GRAHAMCC426 - Graham Correctional Center • DOC - Corrections. Place of performance: IL. Response deadline: Jan 16, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
FY26 CLEARVIEW PROTECTIVE FABRIC Clearview RK Protective Mattress Covering Item # 1: ( 850 - 52 ) CLEARVIEW RK, 11 oz. Double Coated Institutional Protective Fabric for mattress covering. 3 ply vinyl-polyester laminate consisting of 2 layers of clear PVC vinyl with 1 layer of polyester Rochelle Knit scrim between. Defects in rolls will not be accepted. Rolls must be continuous. Roll width: 86 inch, Roll Length minimum 100 yards. Minimum Weight 11oz./Sq. Yd. +/- 0.5 oz. ASTM D3776. Grab Tear strength (lb./inch), 134 (w) x 92 (f) ASTM D5034-09. Trapezoid Tear (lb.), 55 (w) x 22 (f) ASTM D5587-14. Tongue Tear (lb./inch): 11 (w) x 7 (f) ASTM D2261-13. Antibacterial: AATCC-30. 100% Polyester Scrim, 2.5 oz. ROCHELLE KNIT. Coating: Clear PVC that is free of heavy metals. Flame Retardancy, Pass NFPA 702. Product must contain NO arsenic. DO NOT SUBSTITUTE. CLEARVIEW RK, 11 oz. Double Coated Institutional Protective Fabric for mattress covering. 3 ply vinyl-polyester laminate consisting of 2 layers of clear PVC vinyl with 1 layer of polyester Rochelle Knit scrim between. Defects in rolls will not be accepted. Rolls must be continuous. Roll width: 86 inch, Roll Length minimum 100 yards. Minimum Weight 11oz./Sq. Yd. +/- 0.5 oz. ASTM D3776. Grab Tear strength (lb./inch), 134 (w) x 92 (f) ASTM D5034-09. Trapezoid Tear (lb.), 55 (w) x 22 (f) ASTM D5587-14. Tongue Tear (lb./inch): 11 (w) x 7 (f) ASTM D2261-13. Antibacterial: AATCC-30. 100% Polyester Scrim, 2.5 oz. ROCHELLE KNIT. Coating: Clear PVC that is free of heavy metals. Flame Retardancy, Pass NFPA 702. Product must contain NO arsenic. DO NOT SUBSTITUTE. Item # 2: Delivery must be within 15 days of receipt of purchase order. Please ensure you can meet this timeframe prior to submitting quote. Delivery must be within 15 days of receipt of purchase order. Please ensure you can meet this timeframe prior to submitting quote. Item # 3: A Basic Ordering Agreement (BOA) can be found in the attachments. Please complete information on page one, and sign pages three and ten. Please note in the line items if the item you are supplying is different than the specification in BidBuy. A Basic Ordering Agreement (BOA) can be found in the attachments. Please complete information on page one, and sign pages three and ten. Please note in the line items if the item you are supplying is different than the specification in BidBuy. Item # 4: Freight Charges must be included in total price. Freight Charges must be included in total price.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.