Skip to content
DOC - Corrections

DOC-DIX CC- Three-Year Electrical Services -JL

Solicitation: Not available
Notice ID: 26-426DOC-DIXON-B-51211

Federal opportunity from DIXONCC426 - Dixon Correctional Center • DOC - Corrections. Place of performance: IL. Response deadline: Mar 04, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,310,325,434
Sector total $1,310,325,434 • Share 100.0%
Live
Median
$227,621
P10–P90
$31,601$2,474,119
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,310,325,434)
Deal sizing
$227,621 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for IL
Live POP
Place of performance
Dixon Correctional Center Maintenance 2600 N. Brinton Ave Dixon, IL 61021 US Email: noreply@illinois.gov Phone: (000) 000-0000
State: IL
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 23, 2026
Illinois • Alexander, Champaign, Christian +38
tes Fringes Asbestos Workers/Insulator Includes the application, installation, and cleanup of all insulating materials, protective coverings, coatings, and finishings to all types of mechanical systems
Base: $43.48 • Fringe: $27.24
ASBESTOS WORKER/INSULATOR Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems
Base: $55.02 • Fringe: $35.75
Fire Stop Technician
Base: $44.02 • Fringe: $32.76
Match signal: state match
Published Jan 16, 2026
Illinois • Jersey
but excluding multi- building apartment complexes or apartment buildings that have commercial stores or professional quarters in conjunction with commercial ventures such as nursing homes, motels, inc
Base: $30.49 • Fringe: $8.58
POWER EQUIPMENT OPERATOR Group 1
Base: $40.95 • Fringe: $34.95
PLUMBER/PIPEFITTER (Including HVAC)
Base: $51.61 • Fringe: $21.45
Match signal: state match
Published Jan 16, 2026
Illinois • Alexander
BRICKLAYER
Base: $30.79 • Fringe: $21.69
Carpenter/Drywall Hanger (including Batt Insulator)
Base: $31.30 • Fringe: $18.90
ELECTRICIAN Work not to exceed 8-plex family housing units
Base: $32.58 • Fringe: $12.11
Match signal: state match
Published Jan 16, 2026
Illinois • Perry, Randolph
BRICKLAYER
Base: $30.79 • Fringe: $21.69
CARPENTER (Including Drywall and Batt Insulation)
Base: $31.30 • Fringe: $18.90
Carpenter & Drywall Hanger (including Batt Insulator)
Base: $31.30 • Fringe: $18.90
Match signal: state match

Point of Contact

Not available

Agency & Office

Department
DOC - Corrections
Agency
DIXONCC426 - Dixon Correctional Center
Subagency
DIXONCC426 - Dixon Correctional Center
Office
BF001 - Dixon Correctional Center
Contracting Office Address
Not available

Description

DOC-DIX CC- Three-Year Electrical Services -JL Three-year Electrical Service and Repair contract for Dixon Correctional Center. Item # 1: ( 910 - 82 ) Dixon CC: Basic hourly labor rate Mon-Fri 7 am-3 pm for the first year. Dixon CC: Basic hourly labor rate Mon-Fri 7 am-3 pm for the first year. Item # 2: ( 910 - 82 ) Dixon CC: Basic hourly labor rate, Mon-Fri 3 pm-7 am, including holidays, Saturdays and Sundays for the first year. Dixon CC: Basic hourly labor rate, Mon-Fri 3 pm-7 am, including holidays, Saturdays and Sundays for the first year. Item # 4: ( 910 - 82 ) Dixon CC: Foreman hourly labor rate Mon-Fri 7 am-3 pm for the first year. Dixon CC: Foreman hourly labor rate Mon-Fri 7 am-3 pm for the first year. Item # 5: ( 910 - 82 ) Dixon CC: Foreman hourly labor rate, Mon-Fri 3 pm-7 am, including holidays, Saturdays and Sundays for the first year. Dixon CC: Foreman hourly labor rate, Mon-Fri 3 pm-7 am, including holidays, Saturdays and Sundays for the first year. Item # 7: ( 910 - 82 ) Dixon CC: Basic hourly labor rate Mon-Fri 7 am-3 pm for the second year. Dixon CC: Basic hourly labor rate Mon-Fri 7 am-3 pm for the second year.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.