DNR MORAINE VIEW FILTER MEDIA FOR WATER TREATMENT SYSTEM
Federal opportunity from LNDMGMT422 - Office of Land Management • DNR - Natural Resources. Place of performance: IL. Response deadline: Mar 03, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
Description
DNR MORAINE VIEW FILTER MEDIA FOR WATER TREATMENT SYSTEM Item # 1: ( 885 - 08 ) Replace filter media in water treatment system. Phase 1-4 see attached scope of work. Replace filter media in water treatment system. Phase 1-4 see attached scope of work. Item # 2: ( 885 - 08 ) Water system analytical testing. Phase 5 . See attached scope of work. Water system analytical testing. Phase 5 . See attached scope of work.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.