ISD- Track Surface Sealant
Federal opportunity from ISDISVI444 - ISD/ISVI • DHS - Human Services. Place of performance: IL. Response deadline: Jan 14, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
ISD- Track Surface Sealant The Illinois Dept. of Human Services are seeking bids for Track Field sealing. The surface of the track at the Illinois School for the Deaf needs to be sealed located at 125 S. Webster Avenue, Jacksonville, Il. Sealing the track is necessary to prevent deterioration, cracks, and uneven surfaces. Item # 1: ( 909 - 17 ) The Illinois School for the Deaf is seeking a vendor to seal the surface on the running track. Bidders must: Prime surface of the track using a mixture of polyurethane binder and solvent. Apply two separate applications of a structural spray coat at a rate of 3.1-3.8 LBS/SY. Spray coat shall be a mixture of polyurethane and EPDM rubber granules. Contractor shall provide an even spraying surface with no streaking or ponding. Track must have lane markings, numbers, stripes, etc. re applied once spray coat has cured. Line marking paint should conform to synthetic surface manufacturers specs. Maintain a clean and orderly job site with all debris removed daily and at the completion of the job. Take care not to damage grounds and structures at the facility. Specifications for this project will be attached as the SOW for Track. Please see attachment for more details. The Illinois School for the Deaf is seeking a vendor to seal the surface on the running track. Bidders must: Prime surface of the track using a mixture of polyurethane binder and solvent. Apply two separate applications of a structural spray coat at a rate of 3.1-3.8 LBS/SY. Spray coat shall be a mixture of polyurethane and EPDM rubber granules. Contractor shall provide an even spraying surface with no streaking or ponding. Track must have lane markings, numbers, stripes, etc. re applied once spray coat has cured. Line marking paint should conform to synthetic surface manufacturers specs. Maintain a clean and orderly job site with all debris removed daily and at the completion of the job. Take care not to damage grounds and structures at the facility. Specifications for this project will be attached as the SOW for Track. Please see attachment for more details.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.