Skip to content
CMS - Central Management Services

JPMC Snow and Ice Control Equipment

Solicitation: Not available
Notice ID: 26-416CMS-BOSS4-B-50785

Federal opportunity from BOSS41610 - Strategic Sourcing • CMS - Central Management Services. Place of performance: IL. Response deadline: Mar 11, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$386,765,285
Sector total $386,765,285 • Share 100.0%
Live
Median
$129,570
P10–P90
$32,637$689,094
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($386,765,285)
Deal sizing
$129,570 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for IL
Live POP
Place of performance
Bureau of Strategic Sourcing 300 W Jefferson St, Springfield, IL 62702 US Email: CMS.Boss.Sourcing@illinois.gov Phone: (217) 558-3765
State: IL
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
IL20260002 (Rev 3)
Match signal: state matchOpen WD
Published Jan 23, 2026Illinois • Alexander, Champaign, Christian +38
Rate
tes Fringes Asbestos Workers/Insulator Includes the application, installation, and cleanup of all insulating materials, protective coverings, coatings, and finishings to all types of mechanical systems
Base $43.48Fringe $27.24
Rate
ASBESTOS WORKER/INSULATOR Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems
Base $55.02Fringe $35.75
+182 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 182 more rate previews.
Davis-BaconBest fitstate match
IL20260002 (Rev 3)
Open WD
Published Jan 23, 2026Illinois • Alexander, Champaign, Christian +38
Rate
tes Fringes Asbestos Workers/Insulator Includes the application, installation, and cleanup of all insulating materials, protective coverings, coatings, and finishings to all types of mechanical systems
Base $43.48Fringe $27.24
Rate
ASBESTOS WORKER/INSULATOR Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems
Base $55.02Fringe $35.75
Rate
Fire Stop Technician
Base $44.02Fringe $32.76
+181 more occupation rates in this WD
Davis-Baconstate match
IL20260027 (Rev 1)
Open WD
Published Jan 16, 2026Illinois • Jackson
Rate
BRICKLAYER
Base $30.79Fringe $21.69
Rate
Carpenter/Drywall Hanger (including Batt Insulator)
Base $31.30Fringe $18.90
Rate
ELECTRICIAN Work not to exceed 8-plex family housing units
Base $32.58Fringe $12.11
+7 more occupation rates in this WD
Davis-Baconstate match
IL20260024 (Rev 2)
Open WD
Published Jan 16, 2026Illinois • Williamson
Rate
BRICKLAYER
Base $30.79Fringe $21.69
Rate
Carpenter/Drywall Hanger (including Batt Insulator)
Base $31.30Fringe $18.90
Rate
ELECTRICIAN Work not to exceed 8-plex family housing units
Base $32.58Fringe $12.11
+7 more occupation rates in this WD
Davis-Baconstate match
IL20260030 (Rev 1)
Open WD
Published Jan 16, 2026Illinois • Jersey
Rate
but excluding multi- building apartment complexes or apartment buildings that have commercial stores or professional quarters in conjunction with commercial ventures such as nursing homes, motels, inc
Base $30.49Fringe $8.58
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $40.95Fringe $34.95
Rate
PLUMBER/PIPEFITTER (Including HVAC)
Base $51.61Fringe $21.45
+2 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
CMS - Central Management Services
Agency
BOSS41610 - Strategic Sourcing
Subagency
BOSS41610 - Strategic Sourcing
Office
AG001 - Strategic Sourcing
Contracting Office Address
Not available

Description

JPMC Snow and Ice Control Equipment CMS, in agreement with the Chief Procurement Officer for General Services (CPO-GS), desires to establish a joint purchase master contract for snow and ice control equipment repair parts and accessories. Item # 30: ( 765 - 61 ) BIDDER SHALL ENTER $20,000 IN THE UNIT COST FIELD AND THEN ENTER THE % DISCOUNT THAT WILL BE USED FROM THE MSRP CATALOG.*****RAIKO REPAIR PARTS AND ACCESSORIES DISCOUNT FOR ALL SNOW AND ICE CONTROL EQUIPMENT. BID SHALL BE A SINGLE PERCENT DISCOUNT FROM THE MANUFACTURER'S SUGGESTED RETAIL PRICE (MSRP) COLUMN FOR THE COMPLETE LINE OF THE SNOW AND ICE CONTROL EQUIPMENT AS SHOWN IN THE MOST CURRENT EDITION OF THE MANUFACTURER'S PRICE LIST. BIDDER SHALL ENTER $20,000 IN THE UNIT COST FIELD AND THEN ENTER THE % DISCOUNT THAT WILL BE USED FROM THE MSRP CATALOG.*****RAIKO REPAIR PARTS AND ACCESSORIES DISCOUNT FOR ALL SNOW AND ICE CONTROL EQUIPMENT. BID SHALL BE A SINGLE PERCENT DISCOUNT FROM THE MANUFACTURER'S SUGGESTED RETAIL PRICE (MSRP) COLUMN FOR THE COMPLETE LINE OF THE SNOW AND ICE CONTROL EQUIPMENT AS SHOWN IN THE MOST CURRENT EDITION OF THE MANUFACTURER'S PRICE LIST. Item # 31: ( 765 - 66 ) BIDDER SHALL ENTER $250,000 IN THE UNIT COST FIELD AND THEN ENTER THE % DISCOUNT THAT WILL BE USED FROM THE MSRP CATALOG.*****MONROE REPAIR PARTS AND ACCESSORIES DISCOUNT FOR SNOW AND ICE CONTROL EQUIPMENT OR APPROVED EQUAL. BID SHALL BE A SINGLE PERCENT DISCOUNT FROM THE MANUFACTURER'S SUGGESTED RETAIL PRICE (MSRP) COLUMN FOR THE COMPLETE LINE OF THE SNOW AND ICE CONTROL EQUIPMENT AS SHOWN IN THE MOST CURRENT EDITION OF THE MANUFACTURER'S PRICE LIST. BIDDER SHALL ENTER $250,000 IN THE UNIT COST FIELD AND THEN ENTER THE % DISCOUNT THAT WILL BE USED FROM THE MSRP CATALOG.*****MONROE REPAIR PARTS AND ACCESSORIES DISCOUNT FOR SNOW AND ICE CONTROL EQUIPMENT OR APPROVED EQUAL. BID SHALL BE A SINGLE PERCENT DISCOUNT FROM THE MANUFACTURER'S SUGGESTED RETAIL PRICE (MSRP) COLUMN FOR THE COMPLETE LINE OF THE SNOW AND ICE CONTROL EQUIPMENT AS SHOWN IN THE MOST CURRENT EDITION OF THE MANUFACTURER'S PRICE LIST. Item # 32: ( 765 - 66 ) BIDDER SHALL ENTER $250,000 IN THE UNIT COST FIELD AND THEN ENTER THE % DISCOUNT THAT WILL BE USED FROM THE MSRP CATALOG.*****SWENSON REPAIR PARTS AND ACCESSORIES DISCOUNT FOR SNOW AND ICE CONTROL EQUIPMENT OR APPROVED EQUAL. BID SHALL BE A SINGLE PERCENT DISCOUNT FROM THE MANUFACTURER'S SUGGESTED RETAIL PRICE (MSRP) COLUMN FOR THE COMPLETE LINE OF THE SNOW AND ICE CONTROL EQUIPMENT AS SHOWN IN THE MOST CURRENT EDITION OF THE MANUFACTURER'S PRICE LIST. BIDDER SHALL ENTER $250,000 IN THE UNIT COST FIELD AND THEN ENTER THE % DISCOUNT THAT WILL BE USED FROM THE MSRP CATALOG.*****SWENSON REPAIR PARTS AND ACCESSORIES DISCOUNT FOR SNOW AND ICE CONTROL EQUIPMENT OR APPROVED EQUAL. BID SHALL BE A SINGLE PERCENT DISCOUNT FROM THE MANUFACTURER'S SUGGESTED RETAIL PRICE (MSRP) COLUMN FOR THE COMPLETE LINE OF THE SNOW AND ICE CONTROL EQUIPMENT AS SHOWN IN THE MOST CURRENT EDITION OF THE MANUFACTURER'S PRICE LIST. Item # 33: ( 765 - 66 ) BIDDER SHALL ENTER $240,000 IN THE UNIT COST FIELD AND THEN ENTER THE % DISCOUNT THAT WILL BE USED FROM THE MSRP CATALOG.*****DICKEY JOHN REPAIR PARTS AND ACCESSORIES DISCOUNT FOR SNOW AND ICE CONTROL EQUIPMENT OR APPROVED EQUAL. BID SHALL BE A SINGLE PERCENT DISCOUNT FROM THE MANUFACTURER'S SUGGESTED RETAIL PRICE (MSRP) COLUMN FOR THE COMPLETE LINE OF THE SNOW AND ICE CONTROL EQUIPMENT AS SHOWN IN THE MOST CURRENT EDITION OF THE MANUFACTURER'S PRICE LIST. BIDDER SHALL ENTER $240,000 IN THE UNIT COST FIELD AND THEN ENTER THE % DISCOUNT THAT WILL BE USED FROM THE MSRP CATALOG.*****DICKEY JOHN REPAIR PARTS AND ACCESSORIES DISCOUNT FOR SNOW AND ICE CONTROL EQUIPMENT OR APPROVED EQUAL. BID SHALL BE A SINGLE PERCENT DISCOUNT FROM THE MANUFACTURER'S SUGGESTED RETAIL PRICE (MSRP) COLUMN FOR THE COMPLETE LINE OF THE SNOW AND ICE CONTROL EQUIPMENT AS SHOWN IN THE MOST CURRENT EDITION OF THE MANUFACTURER'S PRICE LIST. Item # 34: A line item will be added at PO to reflect the below minimum order shipping charges. The line will read as follows: The minimum order is $250 for F.O.B. Destination as defined in Section 1.5.1 of the Contract. For any order less than the minimum, the additional freight charge will be added to the invoice as a separate line item and a copy of the freight bill will be submitted with the invoice for payment. A line item will be added at PO to reflect the below minimum order shipping charges. The line will read as follows: The minimum order is $250 for F.O.B. Destination as defined in Section 1.5.1 of the Contract. For any order less than the minimum, the additional freight charge will be added to the invoice as a separate line item and a copy of the freight bill will be submitted with the invoice for payment.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.