Skip to content
Department of Agriculture

MOF Williams River at Tea Creek Bridge Replacement

Solicitation: 12445526B0008
Notice ID: fd4f3e18f24c48afbe8c2c047def3fda
TypePresolicitationNAICS 237310PSCY1LBSet-AsideSBADepartmentDepartment of AgricultureAgencyForest ServiceStateWVPostedApr 01, 2026, 12:00 AM UTCDueApr 15, 2026, 02:00 PM UTCCloses in 7 days

Presolicitation from FOREST SERVICE • AGRICULTURE, DEPARTMENT OF. Place of performance: WV. Response deadline: Apr 15, 2026. Industry: NAICS 237310 • PSC Y1LB.

Market snapshot

Awarded-market signal for NAICS 237310 (last 12 months), benchmarked to sector 23.

12-month awarded value
$683,595,008
Sector total $37,204,442,544 • Share 1.8%
Live
Median
$552,706
P10–P90
$81,119$1,327,479
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
1.8%
share
Momentum (last 3 vs prior 3 buckets)
+1%($2,067,129)
Deal sizing
$552,706 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for WV
Live POP
Place of performance
West Virginia • United States
State: WV
Contracting office
Atlanta, GA • 303092449 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
WV20260069 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026West Virginia • Kanawha
Rate
INSULATOR - PIPE & PIPEWRAPPER
Base $38.05Fringe $28.47
Rate
CARPENTER (Includes Form Work; Excludes Scaffold Builder)
Base $29.00Fringe $22.41
+29 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 29 more rate previews.
Davis-BaconBest fitstate match
WV20260069 (Rev 0)
Open WD
Published Jan 02, 2026West Virginia • Kanawha
Rate
INSULATOR - PIPE & PIPEWRAPPER
Base $38.05Fringe $28.47
Rate
CARPENTER (Includes Form Work; Excludes Scaffold Builder)
Base $29.00Fringe $22.41
Rate
MILLWRIGHT
Base $39.60Fringe $26.06
+28 more occupation rates in this WD
Davis-Baconstate match
WV20260089 (Rev 0)
Open WD
Published Jan 02, 2026West Virginia • Mingo
Rate
CARPENTER
Base $33.80Fringe $27.34
Rate
OPERATOR: Loader Six (6) cubic yards capacity and over
Base $40.35Fringe $20.30
Rate
OPERATOR: Crane
Base $40.35Fringe $20.30
+24 more occupation rates in this WD
Davis-Baconstate match
WV20260110 (Rev 0)
Open WD
Published Jan 02, 2026West Virginia • Hampshire, Morgan
Rate
CARPENTER
Base $30.00Fringe $25.06
Rate
OPERATOR: Crane
Base $40.35Fringe $20.30
Rate
OPERATOR: Backhoe/Excavator/Trackhoe
Base $37.59Fringe $20.30
+23 more occupation rates in this WD
Davis-Baconstate match
WV20260109 (Rev 0)
Open WD
Published Jan 02, 2026West Virginia • Brooke, Hancock, Ohio
Rate
CARPENTER
Base $33.80Fringe $27.34
Rate
OPERATOR: Crane
Base $40.35Fringe $20.30
Rate
OPERATOR: Backhoe/Excavator/Trackhoe
Base $37.59Fringe $20.30
+22 more occupation rates in this WD

Point of Contact

Name
Kevin Brown
Email
kevin.brown2@usda.gov
Phone
Not available

Agency & Office

Department
AGRICULTURE, DEPARTMENT OF
Agency
FOREST SERVICE
Subagency
USDA-FS, CSA EAST 13
Office
Not available
Contracting Office Address
Atlanta, GA
303092449 USA

More in NAICS 237310

Description

THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR ABOUT April 15, 2026. 

PROJECT DESCRIPTION: MOF Williams River at Tea Creek Bridge Replacement.
Work for this project consists of, but is not limited to: Furnishing and installing one two span box beam bridge system on FR 135 Tea Creek Campground Bridge Replacement. Construction survey and staking, E&S, clearing and grubbing, installation of cofferdams and dewatering the site, excavation for placement of riprap, removal of existing structure, installation of bridge structure, micro piling design and installation, roadway subbase and aggregate, asphalt cement, guardrail, and riprap armoring. Other construction activities to be expected are turbidity monitoring, in-channel Perimeter Control. Fish Relocation fish removal, candy darter monitoring and capturing, and stream rehabilitation. Contractor is responsible for ensuring all equipment meets State, Federal, and Local Laws.

PROJECT LOCATION: This project is located in the Monongahela National Forest on the Marlinton Ranger District Ranger District. 
Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Both performance and payment bonds will be required for this project as well as a bid guarantee. Estimated project magnitude is between $1,000,000 and $5,000,000. NAICS 237310 with size standard $45 mil. 

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.