Skip to content
Department of Defense

Design-Build (DB) Barracks Initiative (Package #2), Marine Corps Base (MCB) Camp Lejeune, North Carolina

Solicitation: Not available
Notice ID: f906765a79a8fbcc171080d6b5d36ef2
DepartmentDepartment of DefenseStateNCPostedMar 10, 2026, 12:00 AM UTCDueApr 03, 2026, 12:00 AM UTCCloses in 20 days

Federal opportunity from DEPT OF DEFENSE. Place of performance: NC. Response deadline: Apr 03, 2026.

DoD CMMC Readiness
Modern compliance support by Federal Bid Partners

CMMC support options for this DoD solicitation

As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.

Done-for-you service
CMMC start-to-finish with FBP
$2,000
Registered Practitioner logo
Guided by a Registered Practitioner with practical DoD workflow support.
  • Gap review, remediation roadmap, and implementation support
  • Policy package, evidence mapping, and submission prep
  • Designed for primes and subs across non-tech and tech work
Start CMMC with Federal Bid Partners →
AI-powered application
CMMC Pulsar™ start-to-finish
$399
CMMC Pulsar logo
First-of-its-kind CMMC Pulsar™ app to run your CMMC workflow with AI assistance.
  • Structured checklist, AI guidance, and progress tracking
  • Build evidence and controls with clearer next-step workflows
  • Ideal for teams that want speed plus affordability
Open CMMC Pulsar™ →
Requirements vary by acquisition and contract type; COTS-only exceptions may apply.

Market snapshot

Awarded-market signal for this department (last 12 months).

12-month awarded value
$5,901,184,063,278
Sector total $5,901,184,063,278 • Share 100.0%
Live
Median
$124,864
P10–P90
$30,966$810,714
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+79380%($5,885,871,900,718)
Deal sizing
$124,864 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
NC, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
NC20260050 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026North Carolina • Alleghany
Rate
PIPEFITTER (Excluding HVAC System Installation)
Base $31.66Fringe $12.69
Rate
BRICKLAYER
Base $18.45Fringe $4.18
+19 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 19 more rate previews.
Davis-BaconBest fitstate match
NC20260050 (Rev 0)
Open WD
Published Jan 02, 2026North Carolina • Alleghany
Rate
PIPEFITTER (Excluding HVAC System Installation)
Base $31.66Fringe $12.69
Rate
BRICKLAYER
Base $18.45Fringe $4.18
Rate
CARPENTER (Drywall Hanging Only)
Base $17.59Fringe $2.31
+18 more occupation rates in this WD
Davis-Baconstate match
NC20260019 (Rev 1)
Open WD
Published Jan 30, 2026North Carolina • Alamance, Alexander, Alleghany +97
Rate
CLASS A1
Base $48.48Fringe $15.34
Rate
b CLASS A2
Base $43.20Fringe $14.99
Rate
b CLASS B1
Base $41.93Fringe $14.90
+17 more occupation rates in this WD
Davis-Baconstate match
NC20260125 (Rev 0)
Open WD
Published Jan 02, 2026North Carolina • Edgecombe, Nash, Pitt
Rate
ELECTRICIAN
Base $31.07Fringe $14.83
Rate
IRONWORKER
Base $29.75Fringe $18.00
Rate
PIPEFITTER
Base $33.96Fringe $13.48
+17 more occupation rates in this WD
Davis-Baconstate match
NC20260077 (Rev 0)
Open WD
Published Jan 02, 2026North Carolina • Anson, Cabarrus, Gaston
Rate
CARPENTER, Includes Form Work
Base $13.98Fringe $0.69
Rate
ELECTRICIAN
Base $15.41Fringe $3.13
Rate
LABORER: Common or General
Base $11.22Fringe $1.36
+5 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
DEPT OF DEFENSE
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

DESIGN-BUILD (DB) BARRACKS INITIATIVE (PACKAGE #2), MARINE CORPS BASE (MCB) CAMP LEJEUNE, NC AND MARINE CORPS AIR STATION (MCAS) NEW RIVER, NC. THE PROPOSED DESIGN-BUILD PROJECT INCLUDES THE DEMOLITION OF FIVE BACHELOR ENLISTED QUARTERS BUILDINGS AND WILL PROVIDE BY REPLACEMENT BILLETING CAPACITY OF 565 TWO-PERSON ROOMS TO SUPPORT 1,130 PERSONNEL AT MARINE CORPS BASE (MCB) CAMP LEJEUNE AND MARINE CORPS AIR STATION (MCAS) NEW RIVER. THIS REQUEST FOR PROPOSAL (RFP) IS FOR PHASE ONE FACTORS 1-4 ONLY. OFFERORS WHO HAVE BEEN SELECTED FOR PHASE TWO WILL BE NOTIFIED DIRECTLY TO SUBMIT FACTORS 5-6 AND PRICE PROPOSAL. **THIS SOLICITATION INCLUDES CMMC LEVEL 1 (SELF) REQUIREMENTS IN ACCORDANCE WITH DFARS 252.204-7025 AND 252.204-7021** THIS AC...

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.