MT PRAIRIE 2016(3), Milwaukee Bridge Resurfacing and Rehabilitation
Presolicitation from FEDERAL HIGHWAY ADMINISTRATION • TRANSPORTATION, DEPARTMENT OF. Place of performance: MT. Industry: NAICS 237310 • PSC Y1LB.
Market snapshot
Awarded-market signal for NAICS 237310 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 237310
Description
MT PRAIRIE 2016(3), Milwaukee Bridge Resurfacing and Rehabilitation
Prairie County, Montana
This work consists of replacement of existing timber decking with metal grid bridge deck, replacement of existing timber railing with metal bridge rail, performing scour remediation and concrete repair, and grading and resurfacing of the roadway adjacent to the bridge.
Project Location: This project is located approximately 5 miles west of Terry City, Prairie County, Montana State.
Project Length: 0.348 Mile
Estimated Price Range: Between $5,000,000 and $10,000,000
Tentative Solicitation Date: Spring/ Summer 2026
Tentative Fixed Completion Date: Fall/ Winter 2026
See attachments for additional data
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The MT PRAIRIE 2016(3) project involves resurfacing and rehabilitation of a bridge in Prairie County, Montana. The scope includes replacing timber decking with a metal grid deck and performing concrete repairs, among other tasks. The estimated price range for the project is between $5,000,000 and $10,000,000, with a tentative solicitation date in Spring/Summer 2026.
The buyer aims to procure services for the replacement of existing bridge materials and restoration of infrastructure to improve the safety and functionality of the bridge located approximately 5 miles west of Terry City, Montana.
- Replacement of existing timber decking with metal grid bridge deck
- Replacement of existing timber railing with metal bridge rail
- Performing scour remediation and concrete repair
- Grading and resurfacing of the roadway adjacent to the bridge
- Company capabilities statement
- Past performance references
- Technical approach to meet project requirements
- Cost proposal adhering to the estimated price range
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Response deadline not specified
- Specific performance start and end dates not listed
- More detailed environmental compliance requirements needed
- Clarification on bond requirements for bidders
- Clarification on the format for submissions
- Further details on subcontractor approval processes needed
- Information on community impacts or stakeholder involvement in the project
- Accessibility requirements for the project that may apply
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.