Skip to content
Department of Transportation

NV FLAP NYE 10(1) Bob Ruud Mem Hwy & Bell Vista Ave

Solicitation: 6982AF26B000003
Notice ID: e8293b11f79547f8ac01950f16f0746a

Presolicitation from FEDERAL HIGHWAY ADMINISTRATION • TRANSPORTATION, DEPARTMENT OF. Place of performance: NV. Response deadline: Apr 17, 2026. Industry: NAICS 237310 • PSC Y1LB.

Market snapshot

Awarded-market signal for NAICS 237310 (last 12 months), benchmarked to sector 23.

12-month awarded value
$683,595,008
Sector total $37,204,442,544 • Share 1.8%
Live
Median
$552,706
P10–P90
$81,119$1,327,479
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
1.8%
share
Momentum (last 3 vs prior 3 buckets)
+1%($2,067,129)
Deal sizing
$552,706 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for NV
Live POP
Place of performance
Amargosa Valley, Nevada • 89020 United States
State: NV
Contracting office
Lakewood, CO • 80228 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
NV20260038 (Rev 1)
Match signal: state matchOpen WD
Published Jan 30, 2026Nevada • Clark
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $62.00Fringe $23.48
Rate
BRICKLAYER
Base $53.57Fringe $20.05
+53 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 53 more rate previews.
Davis-BaconBest fitstate match
NV20260038 (Rev 1)
Open WD
Published Jan 30, 2026Nevada • Clark
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $62.00Fringe $23.48
Rate
BRICKLAYER
Base $53.57Fringe $20.05
Rate
TILE FINISHER
Base $37.35Fringe $14.22
+52 more occupation rates in this WD
Davis-Baconstate match
NV20260024 (Rev 1)
Open WD
Published Jan 30, 2026Nevada • Clark
Rate
ELECTRICIAN Excluding Low Voltage
Base $58.48Fringe $27.62
Rate
Low Voltage Wiring Only
Base $58.48Fringe $27.62
Rate
LINE CONSTRUCTION Groundman
Base $38.74Fringe $19.36
+36 more occupation rates in this WD
Davis-Baconstate match
NV20260046 (Rev 1)
Open WD
Published Jan 30, 2026Nevada • Churchill
Rate
OPERATOR: Asphalt/Concrete Laydown
Base $60.39Fringe $30.38
Rate
OPERATOR: Bulldozer
Base $60.39Fringe $30.38
Rate
OPERATOR: Grader/Blade
Base $50.47Fringe $30.38
+23 more occupation rates in this WD
Davis-Baconstate match
NV20260052 (Rev 1)
Open WD
Published Jan 30, 2026Nevada • Nye
Rate
OPERATOR: Asphalt/Concrete Laydown
Base $60.39Fringe $30.38
Rate
OPERATOR: Bulldozer
Base $60.39Fringe $30.38
Rate
OPERATOR: Grader/Blade
Base $50.47Fringe $30.38
+23 more occupation rates in this WD

Point of Contact

Name
Denise Martinez
Email
CFLAcquisitiions@dot.gov
Phone
Not available
Name
Ryan Phillips
Email
CFLAcquisitiions@dot.gov
Phone
Not available

Agency & Office

Department
TRANSPORTATION, DEPARTMENT OF
Agency
FEDERAL HIGHWAY ADMINISTRATION
Subagency
6982AF CENTRAL FEDERAL LANDS DIVISI
Office
Not available
Contracting Office Address
Lakewood, CO
80228 USA

More in NAICS 237310

Description

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

PROJECT NUMBER:  NV FLAP NYE 10(1)

PROJECT NAME:  Bob Ruud Mem Hwy & Bell Vista Ave

PROJECT DESCRIPTION: The Central Federal Lands Highway Division (CFLHD) intends to issue a solicitation for the reconstruction and rehabilitation of approximately 20 miles of roadway. The project begins in Pahrump at the intersection of State Highway 160 and Bell Vista Avenue and provides access to Ash Meadows National Wildlife Refuge and Death Valley National Park.

The project aims to improve safety and drainage on Bob Ruud Memorial Highway and Bell Vista Avenue. Bob Ruud Memorial Highway is characterized as a typical rural highway, while Bell Vista Avenue is in a more urban setting within Pahrump, featuring multiple approach roads.

SCOPE OF THE WORK:  The project consists of roadway reconstruction, rehabilitation, paving, drainage, and safety improvements. Specific work includes full-depth reclamation (FDR), installation of new aggregate base, asphalt paving, and culvert replacement (with some requiring approximately 10 feet of excavation).

PRINCIPAL WORK ITEMS: Major items of work include the following ranges:

Aggregate Base: 30,000 - 50,000 tons

Full Depth Reclamation (4-inch depth): 22 miles

Full Depth Reclamation (8-inch depth): 10 miles

Asphalt Pavement: 65,000 - 80,000 tons

24-inch Culvert: 1,000 - 2,500 LNFT

ANTICIPATED SCHEDULE:  Anticipated advertisement April 2026 with an award June 2026, and a tentative project completion of May 2027.   

ESTIMATED COST RANGE:  Between $20,000,000 and $40,000,000

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.