GAOA Lake Winfield Scott Campground (GA)
Solicitation from FOREST SERVICE • AGRICULTURE, DEPARTMENT OF. Place of performance: GA. Response deadline: Feb 25, 2026. Industry: NAICS 236220 • PSC Y1FB.
Market snapshot
Awarded-market signal for NAICS 236220 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 236220
Description
January 23,2026
Due to the inclement weather, the site visit on January 28, 2026 is postponed. Continue to monitor the description section for new site visit details.
Also, the deadline for questions and quotes will be extended via solicitation amendment.
_________________________________________________________________________________________________
Project: GAOA Lake Winfield Scott Campground Construction located at Blue Ridge Ranger District Chattahoochee-Oconee National Forests 439 Lake Winfield Scott Rd Suches, GA 30572.
Site Visit: Wednesday, 1/28/26 at 10am EST, located at the Blue Ridge Ranger District, 439 Lake Winfield Scott Rd Suches, GA 30572 (Coordinates: 34.732393, -83.976512)
****Bridge construction is ongoing on SR-180 at Slaughter Creek. The roadway is reduced to a single lane with automated traffic signals. Plan accordingly****
RFI's/Questions: Due Friday, 1/30/26 by 1pm EST via email.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The GAOA Lake Winfield Scott Campground construction project is issued by the Forest Service, with a solicitation number of 12445226Q0003. The site visit originally scheduled for January 28, 2026, has been postponed due to inclement weather. This project is set aside for SBA and involves significant preparation, including attendance at a future site visit and submission of questions by January 30, 2026.
The buyer aims to engage contractors for the construction of the GAOA Lake Winfield Scott Campground located within the Blue Ridge Ranger District of the Chattahoochee-Oconee National Forests.
- Site preparation and grading
- Utilities installation
- Building construction
- Roadway improvements
- Environmental compliance measures
- Completed proposal form
- SBA certification documentation
- Proof of prior relevant work experience
- Schedule for project execution
- Cost estimate
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- New site visit date
- Exact period of performance
- Budget estimates for the project
- Details on project components requiring specific environmental permits
- Any historical issues affecting construction at the site
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.