- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
PARTS KIT,BATTERY
Sources Sought from DEFENSE LOGISTICS AGENCY • DEPT OF DEFENSE. Place of performance: OH. Response deadline: Feb 26, 2026. Industry: PSC 6160.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Contract Specialist: John McCarthy Email: john.mccarthy@dla.mil
NSN : 6160-016528615
Approved Source(s) – NORTHROP GRUMMAN SYSTEMS CORPORATION 26916
----------------------------------------------------------------------------------------------------------
The AMC/AMSC for the NSN listed above is “3 D”
AMC "3" Items found to be procured from the actual mfgr or vendor, including a prime contractor who is the actual mfgr. "
AMSC "D" The data needed to acquire these parts competitively is not physically available, it cannot be obtained economically, nor is it possible to draft adequate specifications or any other adequate, economical description of the material for a competitive solicitation. Stratus Systems is the only company at this time that can provide these parts since it is not economically feasible for the government to reverse engineer the items at this time. Based on all available information provided to the Contracting Officer, no other source can provide this item.
----------------------------------------------------------------------------------------------------------
Please review the NSN listed above and provide any sources that may be able to manufacture these items. The approved sources for this NSN are currently listed above. All information may be submitted directly to the Contract Specialist listed above. This information must be provided by the response date indicated above.
Should a company wish to be reviewed and qualified as an “Approved Source”, they may submit an application package through the DLA Land and Maritime Alternate Offer/Source Approval Request (SAR) Program. A SAR package contains all technical data needed to demonstrate that the prospective contractor can competently manufacture the product to the same level of quality or better than the Original Equipment Manufacturer (OEM). The onus is on the contractor to document and demonstrate their product is equal to, or better, than the currently approved item which DLA Land and Maritime is procuring.
For further information, please reference the DLA Land Maritime web page shown below and click on the highlight: Alternate Offer/Source Approval Program for detailed explanation for the information and format necessary for a SAR and for the SAR approval process.
http://www.landandmaritime.dla.mil/programs/altofferor/
Thank you in advance for your assistance.
DIBBS / DLA Details
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.