Y1DA--FY26: NRM (PROJ: 673-CSI-132) D/B 1.5T MRI (ICC)
Presolicitation from VETERANS AFFAIRS, DEPARTMENT OF • VETERANS AFFAIRS, DEPARTMENT OF. Place of performance: FL. Response deadline: Jan 23, 2026. Industry: NAICS 236220 • PSC Z2DA.
Market snapshot
Awarded-market signal for NAICS 236220 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 27 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 236220
Description
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Department of Veterans Affairs is presoliciting bids for a Design-Build (D/B) project to deliver and install a 1.5T MRI system at an unspecified location. This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBC). Prospective bidders should assess their capabilities in MRI technology integration and compliance with healthcare industry standards.
The buyer seeks to establish a contract for the procurement and installation of a state-of-the-art 1.5T MRI system to enhance medical imaging capabilities for veterans. Compliance with health regulations and the ability to deliver quality and timely installation is crucial.
- Assess site requirements for MRI installation
- Design modifications to the facility as needed
- Procure the MRI unit
- Install the MRI unit
- Conduct testing and calibration
- Provide training for medical staff on the MRI system
- Completed proposal form
- Company qualifications and experience
- Project plan including timelines
- Past performance references
- Cost proposal with detailed pricing breakdown
- Evidence of SDVOSBC certification
- Compliance with all regulatory and industry standards
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Exact location of the installation
- Detailed specifications of the MRI unit
- Client expectations for project timeline
- Availability of the facility for site assessment
- Specific regulatory requirements for MRI installations
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.