DESIGN AND ENGINEERING FOR THE KETCHIKAN HIGH SCHOOL BIOMASS HEATING PROJECT
Federal opportunity from Ketchikan Gateway Borough. Place of performance: AK. Response deadline: Mar 15, 2014.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
Description
Home Bid Postings Print Sign up to receive a text message or email when new bids are added! Print Bid Title: DESIGN AND ENGINEERING FOR THE KETCHIKAN HIGH SCHOOL BIOMASS HEATING PROJECT Category: Professional Services Status: Closed Description: ADDENDUM NO. 1 The Ketchikan Gateway Borough (Borough) is soliciting sealed proposals from qualified individuals or firms to provide engineering design service to integrate biomass wood heat to the Ketchikan High School. The project will engineer and design a new wood biomass heating system that is to be integrated with the existing oil fired boiler systems. To receive the Request for Proposals (RFP), please contact: 907-228-6637, Office of the Borough Manager, Ketchikan Gateway Borough, 1900 First Avenue, Suite 210, Ketchikan, Alaska 99901. Requests for the RFP documents may be faxed to 907-228-6684 or emailed to The RFP documents will also be posted on the Borough’s website, http://www.kgbak.us/ Even though the RFP documents are provided online, each firm must register with the Borough by sending an email to: Amy Briggs, Purchasing Officer Proposals from unregistered respondents will not be accepted. The required email must include the firm name, address, telephone number, and fax number. No faxed or oral proposals will be allowed. The Ketchikan Gateway Borough is an Equal Opportunity Employer. This project is funded by the USDA Woody Biomass Utilization Grant. Publication Date/Time: 3/14/2014 12:00 AM Closing Date/Time: 4/23/2014 2:00 PM Addendum Date/Time: 4/2/2014 Related Documents: RFP Airport Biomass Boiler Upgrades 2-20 FINAL FULL Addendum 1 Addendum no. 2 Return To Main Bid Postings Page Live Edit
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.