Construction of New Airport Traffic Control Tower (ATCT) - Grand Forks, ND
Solicitation from FEDERAL AVIATION ADMINISTRATION • TRANSPORTATION, DEPARTMENT OF. Place of performance: ND. Response deadline: Mar 27, 2026. Industry: NAICS 236220 • PSC Y1BA.
Market snapshot
Awarded-market signal for NAICS 236220 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 20 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 236220
Description
AMENDMENT 03 - Extends the proposal due date, incorporates Attachment J-7 Geotechnical Report (located in KSN with other large files. See original solicitation instructions for access)
AMENDMENT 02 - Extends the proposal due date, incorporates Questions and Answers and revises Section L & M.
AMENDMENT 01 - Extends the the deadline for submission of questions and the proposal due date. All other terms and conditions remain unchanged. See the attached amendment for the revised dates.
The Federal Aviation Administration (FAA) has a requirement to build a new Airport Traffic Control Tower (ATCT) and Base Building at the Grand Forks International Airport in Grand Forks, ND.
This solicitation is posted in accordance with FAA Acquisition Management Policy Section 3.2.1.3.11 Public Announcement. Review all attachments pertaining to this solicitation prior to submitting a proposal. This announcement is not intended to guarantee procurement of the services and shall not be construed as a commitment by the Government to enter into a contract. The Government is not liable for costs associated with the preparation, submittal of inquiries or responses to this announcement and will not reimburse any vendors for cost incurred in responding to this public announcement.
The file sizes for the following attachments are too large to upload. To receive the attachments below please email your request to Erin.M.Crabtree@faa.gov.
Attachment J-1 Statement of Work
Attachment J-2 Specifications - Division I
Attachment J-2 Specifications - Division II
Attachment J-2a Drawings
Attachment J-7 Geotechnical Report
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.