Skip to content
Department of Veterans Affairs

C1DZ--621-24-701 EHRM Infrastructure Upgrades Tier 3 Data Center Construction - Mountain Home VAMC

Solicitation: 36C77626B0006
Notice ID: c072e6aaad91455c8d0ac8494ccf6b04
TypeSolicitationNAICS 236220PSCC1DZSet-AsideSDVOSBCDepartmentDepartment of Veterans AffairsStateTNPostedFeb 19, 2026, 12:00 AM UTCDueMar 10, 2026, 06:00 PM UTCCloses in 14 days

Solicitation from VETERANS AFFAIRS, DEPARTMENT OF • VETERANS AFFAIRS, DEPARTMENT OF. Place of performance: TN. Response deadline: Mar 10, 2026. Industry: NAICS 236220 • PSC C1DZ.

Market snapshot

Awarded-market signal for NAICS 236220 (last 12 months), benchmarked to sector 23.

12-month awarded value
$26,076,835,157
Sector total $33,290,444,816 • Share 78.3%
Live
Median
$491,018
P10–P90
$0$61,188,535
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
78.3%
share
Momentum (last 3 vs prior 3 buckets)
+74642%($26,007,149,781)
Deal sizing
$491,018 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for TN
Live POP
Place of performance
Mountain Home, Tennessee • 37684 United States
State: TN
Contracting office
Independence, OH • 44131 USA

Point of Contact

Name
Amanda Webster
Email
Amanda.Webster@va.gov
Phone
216-447-8301
Name
Bridget May
Email
bridget.may@va.gov
Phone
Not available

Agency & Office

Department
VETERANS AFFAIRS, DEPARTMENT OF
Agency
VETERANS AFFAIRS, DEPARTMENT OF
Subagency
PCAC (36C776)
Office
Not available
Contracting Office Address
Independence, OH
44131 USA

More in NAICS 236220

Description

The Mountain Home VAMC is seeking a general contractor to coordinate all design efforts to relocate the main computer room (MCR) on Floor 3 of Building 77 located at James H. Quillen VA Medical Center (JHQVAMC) and make it compliant with VA standards for a Tier 3 data center. The area of work for this project will occur within rooms 3A109 (existing MCR), 3A112, 3A112A, 3A112D, 3A113, 3A113A, and 3A212. Work will include providing redundant power distribution, computer room cooling and distribution, replacement of aged equipment, grounding and bonding, cable management, and new fiber and copper to the new MCR. A new clean-agent system will be provided, as well as a new fire rated assembly within the new MCR, ensuring that all penetrations are sealed appropriately. A new space will be provided in room 3A112A to host cylinder storage for the clean agent system.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.