Bid Tab - S. Country Club Road Improvements
Federal opportunity from City of Muskogee. Place of performance: OK.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 40 more rate previews.↓
Point of Contact
Agency & Office
Description
ENGINEER'S ESTIMATE CONTRACTOR CONTRACTOR Holloway, Updike and Bellen, Inc. Cook's Consulting, LLC Timber Wolf Excavating LLC PO Box 1543 PO Box 10 PO Box 636 Muskogee, OK 74402 Fort Gibson, OK 74434 Broken Arrow, OK 74013 Total Base Bid $1,587,716.00 Total Base Bid $973,710.20 * Total Base Bid $2,048,703.40 Total Alt 1 $575,220.00 Total Alt 1 $578,830.50 Total Alt 1 $609,960.00 Total Alt 2 $861,100.00 Total Alt 2 $572,413.75 Total Alt 2 $1,096,255.00 Base Bid + Alt 1 $2,162,936.00 Base Bid + Alt 1 $1,552,540.70 * Base Bid + Alt 1 $2,658,663.40 Base Bid + Alt 2 $2,448,816.00 Base Bid + Alt 2 $1,546,123.95 * Base Bid + Alt 2 $3,144,958.40 ITEM NO. DESCRIPTION QTY UNIT 1 CLEARING AND GRUBBING 1.00 LSUM $25,000.00 $25,000.00 25,000.00 $25,000.00 25,000.00 $25,000.00 2 UNCLASSIFIED EXCAVATION 5,150.00 CY $15.00 $77,250.00 13.00 $66,950.00 32.00 $164,800.00 3 SELECT BORROW 2,000.00 CY $30.00 $60,000.00 20.00 $40,000.00 50.00 $100,000.00 4 TYPE A - SALVAGED TOPSOIL 1.00 LSUM $10,000.00 $10,000.00 10,000.00 $10,000.00 41,250.00 $41,250.00 5 TEMPORARY SILT FENCE 1,300.00 LF $7.00 $9,100.00 11.00 $14,300.00 6.00 $7,800.00 6 TEMPORARY SILT DIKE 180.00 LF $22.00 $3,960.00 23.00 $4,140.00 10.00 $1,800.00 7 SOLID SLAB SODDING 4,750.00 SY $7.50 $35,625.00 6.00 $28,500.00 6.50 $30,875.00 8 VEGETATIVE MULCHING 1.00 AC $2,000.00 $2,000.00 2,250.00 $2,250.00 1,500.00 $1,500.00 9 AGGREGATE BASE TYPE A 1,370.00 CY $95.00 $130,150.00 55.00 $75,350.00 59.00 $80,830.00 10 STABILIZED SUBGRADE 6,362.00 SY $12.00 $76,344.00 10.00 $63,620.00 12.00 $76,344.00 11 SEPARATOR FABRIC 7,250.00 SY $2.50 $18,125.00 5.00 $36,250.00 25.00 $181,250.00 12 PRIME COAT 3,820.00 GAL $4.00 $15,280.00 1.90 $7,258.00 12.00 $45,840.00 13 SUPERPAVE, TYPE S4 (PG 64-22 OK) 500.00 TONS $190.00 $95,000.00 149.50 $74,750.00 159.00 $79,500.00 14 CLASS C CONCRETE 75.00 CY $900.00 $67,500.00 200.00 $15,000.00 950.00 $71,250.00 15 4" CONCRETE SIDEWALK 660.00 SY $80.00 $52,800.00 75.00 $49,500.00 85.00 $56,100.00 16 INLET W/ JCT. BOX, CI DES. 2C 3.00 EA $10,000.00 $30,000.00 9,130.00 $27,390.00 10,850.00 $32,550.00 17 INLET CI DES. 2 (STD) 3.00 EA $7,000.00 $21,000.00 5,500.00 $16,500.00 8,900.00 $26,700.00 18 INLET (SMD TYPE 1) 5.00 EA $5,000.00 $25,000.00 4,550.00 $22,750.00 7,000.00 $35,000.00 19 MANHOLE (4' DIA) 3.00 EA $4,000.00 $12,000.00 3,500.00 $10,500.00 6,800.00 $20,400.00 20 FIRE HYDRANT RELOCATION 2.00 EA $8,000.00 $16,000.00 2,700.00 $5,400.00 8,500.00 $17,000.00 21 WATER METER RELOCATION 3.00 EA $1,000.00 $3,000.00 1,500.00 $4,500.00 6,500.00 $19,500.00 22 VALVE BOX ADJUST TO GRADE 1.00 EA $2,500.00 $2,500.00 150.00 $150.00 1,500.00 $1,500.00 23 HEADWALL 2.00 EA $3,000.00 $6,000.00 3,500.00 $7,000.00 12,500.00 $25,000.00 24 EDGE DRAIN CONDUIT-PERFORATED 2,600.00 LF $20.00 $52,000.00 11.00 $28,600.00 50.00 $130,000.00 25 EDGE DRAIN OUTLET LATERAL-NONPERFORATED 50.00 LF $20.00 $1,000.00 11.00 $550.00 50.00 $2,500.00 26 36" PREFAB. CULVERT END SEC., ROUND 1.00 EA $5,000.00 $5,000.00 3,000.00 $3,000.00 3,500.00 $3,500.00 27 OUTLET LATERAL HEADWALL 2.00 EA $1,200.00 $2,400.00 400.00 $800.00 14,500.00 $29,000.00 28 (SP) 12" CORRUGATED POLYPROPOPYLENE PIPE 77.00 LF $80.00 $6,160.00 48.00 $3,696.00 95.00 $7,315.00 29 (SP) 18" CORRUGATED POLYPROPOPYLENE PIPE 139.00 LF $120.00 $16,680.00 73.60 $10,230.40 110.00 $15,290.00 30 (SP) 24" CORRUGATED POLYPROPOPYLENE PIPE 36.00 LF $150.00 $5,400.00 90.50 $3,258.00 160.00 $5,760.00 31 (SP) 30" CORRUGATED POLYPROPOPYLENE PIPE 492.00 LF $170.00 $83,640.00 100.00 $49,200.00 190.00 $93,480.00 32 (SP) 36" CORRUGATED POLYPROPOPYLENE PIPE 218.00 LF $190.00 $41,420.00 130.00 $28,340.00 210.00 $45,780.00 33 STANDARD BEDDING MATERIAL, CLASS B 828.00 CY $55.00 $45,540.00 42.00 $34,776.00 60.00 $49,680.00 34 TRENCH EXCAVATION 1,002.00 CY $30.00 $30,060.00 20.00 $20,040.00 25.00 $25,050.00 35 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 1.00 LSUM $25,000.00 $25,000.00 10,000.00 $10,000.00 20,000.00 $20,000.00 36 REMOVAL OF CONCRETE DRIVEWAY 900.00 SY $15.00 $13,500.00 5.00 $4,500.00 15.00 $13,500.00 37 REMOVAL OF GRAVEL DRIVEWAY 46.00 SY $25.00 $1,150.00 5.00 $230.00 5.00 $230.00 38 REMOVAL OF ASPHALT PAVEMENT 7,000.00 SY $12.00 $84,000.00 5.00 $35,000.00 14.00 $98,000.00 39 SAWING PAVEMENT 2,650.00 LF $4.00 $10,600.00 2.50 $6,625.00 20.00 $53,000.00 40 (PL) REMOVE & RESET EXISTING SIGNS 15.00 EA $700.00 $10,500.00 345.00 $5,175.00 900.00 $13,500.00 41 TRAFFIC STRIPE(PAINT)(4" WIDE) 1,387.00 LF $2.00 $2,774.00 0.75 $1,040.25 * 1.20 $1,664.40 42 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE) 5,700.00 LF $2.00 $11,400.00 1.01 $5,757.00 * 2.60 $14,820.00 43 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) 254.00 LF $12.00 $3,048.00 3.45 $876.30 50.00 $12,700.00 44 (SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS) 9.00 EA $350.00 $3,150.00 258.75 $2,328.75 500.00 $4,500.00 45 MANHOLE (4' DIA) 2.00 EA $4,000.00 $8,000.00 3,600.00 $7,200.00 6,800.00 $13,600.00 46 ADD'L. DEPTH IN MANHOLE (4' DIA) 6.00 VF $500.00 $3,000.00 300.00 $1,800.00 500.00 $3,000.00 47 MANHOLES ADJUST TO GRADE 2.00 EA $2,500.00 $5,000.00 800.00 $1,600.00 1,500.00 $3,000.00 48 STANDARD BEDDING MATERIAL, CLASS B 70.00 CY $55.00 $3,850.00 60.00 $4,200.00 60.00 $4,200.00 49 TRENCH EXCAVATION 167.00 CY $30.00 $5,010.00 20.00 $3,340.00 25.00 $4,175.00 50 8" PVC PIPE (SANITARY SEWER) 199.00 LF $200.00 $39,800.00 110.50 $21,989.50 80.00 $15,920.00 51 SWPPP DOCUMENTAINO AND MANAGEMENT 1.00 LSUM $5,000.00 $5,000.00 1,000.00 $1,000.00 14,250.00 $14,250.00 52 MOBILIZATION 1.00 LSUM $125,000.00 $125,000.00 25,000.00 $25,000.00 105,000.00 $105,000.00 53 CONSTRUCTION STAKING LEVEL II 1.00 LSUM $25,000.00 $25,000.00 5,500.00 $5,500.00 31,000.00 $31,000.00 54 CONTRACTORS QUALITY CONTROL 1.00 LSUM $25,000.00 $25,000.00 25,500.00 $25,500.00 25,000.00 $25,000.00 55 CONSTRUCTION TRAFFIC CONTROL 1.00 LSUM $95,000.00 $95,000.00 15,500.00 $15,500.00 48,500.00 $48,500.00 1 SUPERPAVE, TYPE S3 (PG 64-22 OK) 1,800.00 TONS $130.00 $234,000.00 161.00 $289,800.00 140.00 $252,000.00 2 SUPERPAVE, TYPE S4 (PG 64-22 OK) 680.00 TONS $190.00 $129,200.00 149.50 $101,660.00 159.00 $108,120.00 3 COMBINED CURB AND GUTTER (6" BARRIER) 2,160.00 LF $35.00 $75,600.00 30.00 $64,800.00 38.00 $82,080.00 4 6" CONCRETE DRIVEWAY (H.E.S. 175.00 SY $100.00 $17,500.00 95.00 $16,625.00 110.00 $19,250.00 5 8" CONCRETE DRIVEWAY 850.00 SY $135.00 $114,750.00 119.00 $101,150.00 160.00 $136,000.00 6 TACK COAT 834.00 GAL $5.00 $4,170.00 5.75 $4,795.50 15.00 $12,510.00 MATERIAL ALTERNATE NO. 2 1 DOWEL JOINTED P.C.C. PAVT. (PLACEMENT) 6,100.00 SY $50.00 $305,000.00 25.00 $152,500.00 55.00 $335,500.00 2 P.C. CONCRETE FOR PAVEMENT 1,355.00 CY $250.00 $338,750.00 181.25 $245,593.75 385.00 $521,675.00 3 CONC. CURB (6" BARRIER-INTEGRAL) 2,160.00 LF $35.00 $75,600.00 22.00 $47,520.00 38.00 $82,080.00 4 6" CONCRETE DRIVEWAY (H.E.S.) 270.00 SY $100.00 $27,000.00 95.00 $25,650.00 125.00 $33,750.00 5 8" CONCRETE DRIVEWAY 850.00 SY $135.00 $114,750.00 119.00 $101,150.00 145.00 $123,250.00 * Indicates Calculation Error UNIT PRICE TOTAL PRICETOTAL PRICE ROADWAY SEWER CONSTRUCTION BASE BID MATERIAL ALTERNATE NO. 1 BID TABULATION South Country Club Road Muskogee Municipal Authority Muskogee, Oklahoma HUB Project No. 20MUSKCCRD October 9, 2025 10:00 a.m. UNIT PRICEUNIT PRICE TOTAL PRICE
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.