Skip to content
Department of Justice

FCI SCHUYLKILL UPGRADE WATER TANK - 25Z2AD8

Solicitation: 15B21326Q00000003
Notice ID: bad482938fe44afdb7b4d49fc7a0f151

Solicitation from FEDERAL PRISON SYSTEM / BUREAU OF PRISONS • JUSTICE, DEPARTMENT OF. Place of performance: PA. Response deadline: Apr 21, 2026. Industry: NAICS 238990 • PSC 5430.

Market snapshot

Awarded-market signal for NAICS 238990 (last 12 months), benchmarked to sector 23.

12-month awarded value
$36,493,727
Sector total $37,204,442,544 • Share 0.1%
Live
Median
$13,450
P10–P90
$7,210$18,610
Volatility
Volatile85%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
0.1%
share
Momentum (last 3 vs prior 3 buckets)
+376%($23,828,250)
Deal sizing
$13,450 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for PA
Live POP
Place of performance
Minersville, Pennsylvania • 17954 United States
State: PA
Contracting office
Minersville, PA • 17954 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
PA20260081 (Rev 2)
Match signal: state matchOpen WD
Published Jan 30, 2026Pennsylvania • Carbon
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)
Base $40.00Fringe $29.81
Rate
BOILERMAKER
Base $55.00Fringe $35.48
+41 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 41 more rate previews.
Davis-BaconBest fitstate match
PA20260081 (Rev 2)
Open WD
Published Jan 30, 2026Pennsylvania • Carbon
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)
Base $40.00Fringe $29.81
Rate
BOILERMAKER
Base $55.00Fringe $35.48
Rate
BRICKLAYER (Including Pointing, Caulking, and Cleaning)
Base $33.24Fringe $17.78
+40 more occupation rates in this WD
Davis-Baconstate match
PA20260101 (Rev 2)
Open WD
Published Jan 30, 2026Pennsylvania • Northampton
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)
Base $40.00Fringe $29.81
Rate
BOILERMAKER
Base $55.00Fringe $35.48
Rate
BRICKLAYER (Including Pointing, Caulking, and Cleaning)
Base $33.24Fringe $17.78
+36 more occupation rates in this WD
Davis-Baconstate match
PA20260079 (Rev 4)
Open WD
Published Jan 30, 2026Pennsylvania • Butler
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR MECHANICAL- Duct, Pipe & Mechanical System Insulation and Industrial Work (Including Duct and Pipe)
Base $46.50Fringe $29.43
Rate
BOILERMAKER
Base $48.28Fringe $33.17
Rate
TILE FINISHER
Base $28.76Fringe $17.16
+32 more occupation rates in this WD
Davis-Baconstate match
PA20260119 (Rev 1)
Open WD
Published Jan 30, 2026Pennsylvania • Carbon, Lehigh
Rate
BRICKLAYER
Base $45.45Fringe $30.16
Rate
CARPENTER
Base $45.13Fringe $29.04
Rate
ELECTRICIAN (Includes Communication Technician and Low Voltage Wiring)
Base $50.00Fringe $25.93
+5 more occupation rates in this WD

Point of Contact

Name
Stephanie Sandler
Email
ssandler@bop.gov
Phone
5705447310

Agency & Office

Department
JUSTICE, DEPARTMENT OF
Agency
FEDERAL PRISON SYSTEM / BUREAU OF PRISONS
Subagency
FCI SCHUYLKILL
Office
Not available
Contracting Office Address
Minersville, PA
17954 USA

More in NAICS 238990

Description

The Federal Bureau of Prisons, Federal Correctional Institution (FCI) Schuylkill located in Minersville, Pennsylvania intends to make a single award to a responsible entity to provide all necessary equipment, labor, materials, and incidentals to correct the below referenced work on a 500,000 gallon above ground water tank: 

  • Perform a dry interior cleanout to remove sediment.
  • Install an anti-vortex plate on the suction line.
  • Install a cable-type safety climb device on the shell ladder.
  • Post a confined space entry sign at the primary roof hatch.
  • Adjust, calibrate, and lubricate the existing liquid level gauge.
  • Install a thermomete on the tank.
  • Replace the PVC overflow pipe with a steel overflow system, complete with standoffs, flapper valve, and screen.
  • Install two (2) open coil element (OCE) heaters.
  • Install sacrificial anodes on the interior shell.
  • Install a lock on the primary roof hatch. (Owner provided lock)
  • Repair cracks and spalling with a commercial non-shrinking grout.
  • Pressure wash the tank exterior with an antifungal solution.
  • Install a fall protection required sign near the base of the shell ladder.
  • Install a frost-proof drain valve complete with a locking device. (Owner provided lock)
  • Replace the bolts on the primary shell manway with maintenance-free galvanized steel bolts.
  • Clean the area around the anchor bolts, tighten the anchor nuts, and tack weld the nuts to the bolts, repaint.
  • Clean the exposed foundation and seal or paint to protect the concrete.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.