- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
Vindicator Intrusion Detection System Installation Services
Solicitation from DEPT OF THE AIR FORCE • DEPT OF DEFENSE. Place of performance: FL. Response deadline: Apr 15, 2026. Industry: NAICS 561621 • PSC N063.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 561621 (last 12 months), benchmarked to sector 56.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 27 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 561621
Description
A purchase request was submitted for the design, procurement, and installation of an Intrusion Detection System (IDS) in Bldg 503. The Air Combat Training Center (ACTC) has a need for a new physical IDS. The current system is approaching the end of life, having been installed in 2005, with parts no longer commercially available. This necessitates a full replacement of all sensors, installation of new cabling, installation of new access panels, and removal of all old items of the current IDS. The installation shall be done in parallel with the current system to not interfere with daily operations or create a fault.
The Contractor shall provide all necessary equipment and infrastructure upgrades to support system operations and shall integrate the new components into the existing Electronic Security System (ESS) on Tyndall AFB. The Contractor shall provide all ancillary equipment, materials and/or supplies needed for the installation and associated infrastructure. The contractor shall remove all abandoned or unused conductors the maximum extent possible.
**Brand Name restriction to Honeywell Vindicator hardware.**
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.