Skip to content
Department of Agriculture

Trail Hardening MUT, Lake Loop Section

Solicitation: 127EAV26R0010
Notice ID: 9c3959e4511a4657a046080c495ca7d7
TypeSolicitationNAICS 237990PSCZ1PASet-AsideSBADepartmentDepartment of AgricultureAgencyForest ServiceStateTXPostedMar 16, 2026, 12:00 AM UTCDueApr 17, 2026, 09:00 PM UTCCloses in 32 days

Solicitation from FOREST SERVICE • AGRICULTURE, DEPARTMENT OF. Place of performance: TX. Response deadline: Apr 17, 2026. Industry: NAICS 237990 • PSC Z1PA.

Market snapshot

Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.

12-month awarded value
$1,368,808,019
Sector total $34,989,592,026 • Share 3.9%
Live
Median
$1,647,577
P10–P90
$239,538$7,732,505
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
3.9%
share
Momentum (last 3 vs prior 3 buckets)
+158%($604,842,550)
Deal sizing
$1,647,577 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for TX
Live POP
Place of performance
New Waverly, Texas • 77358 United States
State: TX
Contracting office
Albuquerque, NM • 87102 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
TX20260240 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Texas • Comal
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe and Mechanical System Insulation)
Base $29.50Fringe $8.79
Rate
BOILERMAKER
Base $33.17Fringe $24.92
+43 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 43 more rate previews.
Davis-BaconBest fitstate match
TX20260240 (Rev 0)
Open WD
Published Jan 02, 2026Texas • Comal
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe and Mechanical System Insulation)
Base $29.50Fringe $8.79
Rate
BOILERMAKER
Base $33.17Fringe $24.92
Rate
BRICKLAYER
Base $25.50Fringe $8.12
+42 more occupation rates in this WD
Davis-Baconstate match
TX20260216 (Rev 1)
Open WD
Published Jan 23, 2026Texas • Matagorda, Refugio
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.20Fringe $12.38
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.50Fringe $8.89
Rate
BOILERMAKER
Base $33.17Fringe $24.92
+23 more occupation rates in this WD
Davis-Baconstate match
TX20260160 (Rev 0)
Open WD
Published Jan 02, 2026Texas • Jim Hogg
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.50Fringe $8.89
Rate
BOILERMAKER
Base $33.17Fringe $24.92
Rate
IRONWORKER (Reinforcing)
Base $29.64Fringe $8.43
+20 more occupation rates in this WD
Davis-Baconstate match
TX20260035 (Rev 0)
Open WD
Published Jan 02, 2026Texas • El Paso
Rate
CARPENTER, Includes Form Work
Base $12.21Fringe $0.00
Rate
CEMENT MASON/CONCRETE FINISHER
Base $9.29Fringe $0.00
Rate
Laborers: Common
Base $7.96Fringe $0.00
+5 more occupation rates in this WD

Point of Contact

Name
DAVID WATSON
Email
DAVID.L.WATSON@USDA.GOV
Phone
4802049319

Agency & Office

Department
AGRICULTURE, DEPARTMENT OF
Agency
FOREST SERVICE
Subagency
Southwestern Regional Office, Region 3
Office
Not available
Contracting Office Address
Albuquerque, NM
87102 USA

More in NAICS 237990

Description

1. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals and
supervision to complete the project.
2. The contractor shall be responsible to verify the necessary quantities of materials to be
supplied. It is suggested that the contractor visit the project site prior to turning in a
proposal.
3. There are no utilities available at the project site.
4. All work shall be done in accordance with this document, the project plans, and the FP-
14.
5. All trash, debris, rags, water bottles and any other assorted refuse that is not material to
be incorporated into the work shall be removed daily.

1. Disclosure of the Magnitude of Construction (FAR 36.204)
In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $500,000 and $1,000,000.
This magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate.
2. Site Visit
Offerors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work.
Failure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work.
3. Period of Performance
The contractor shall complete all work required under this contract within 365 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract.
The contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities.
4. Bonding Requirements
In accordance with FAR 52.228-15, Performance and Payment Bonds¿Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price.
The required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award.
5. Differing Site Conditions
Offerors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.
 

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.