- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
WV BRUSH CLEARING
Solicitation from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: WV. Response deadline: Jan 30, 2026. Industry: NAICS 561730 • PSC S208.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 561730 (last 12 months), benchmarked to sector 56.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 561730
Description
Amendment 26 January 2026: Closing date has been extended to 30 January 2026 11 am, Statement of Wolrk has been amended to change Period of Performance.
A Questions & Answers has been uploaded.
To request a site visit please contact:
POC CW2 Grant Dale @ 304--282-9054; grant.r.dale.mil@army.mil
See attched pictures if unable to atttend the site visit.
Amendment25 January 2026: SOW has been amended to correct the date of service from February 17, 2025 – February 24, 2025 to February 17, 2026 – February 24, 2026
A second site visit is scheduled for Monday January 26, 2026 @ 10 a.m. weather permittng.
POC CW2 Grant Dale @ 304--282-9054; grant.r.dale.mil@army.mil
See attched pictures if unable to atttend the site visit.
BSA Brush Clearing-Labor, equipment, and materials needed to mow, string trim, and brush-hog area at Base Camp Victory located at the southern region of the Summit Bechtel Reserve in Fayette County, WV, Garden Ground RD, Gate G4. (37°53'25.2"N 81°06'40.2"W. Equipment will be needed to clear the wood line area in and around openings and roads of smaller brush and overgrowth. Other responsibilities will include the cutting of grass, the cutting and chipping of deadfalls and smaller brush. Gravel pad areas will need to be treated with chemical weed and grass killer to prevent the growth of new vegetation. The disposal of any trash that may be collected is also required. If the property is damaged while completing the work, the property will need to be repaired prior to completion. Wage Determination No.: 2015-4295 rev 30 dtd 12/03/2025
See SOW for specific details
A site visit will be conducted Friday January 23, 2026 @ 10 a.am
The link below is the location of the Camp Victory entrance gate and reattached the site map. The location’s a little weird due to it not having a formal address as well as apple maps and google maps having different road names for the location.
https://maps.app.goo.gl/o7TZUyWnsuC5MUim6
POC is CW3 Grant Dale @ 304-282-9054
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.