Skip to content
City of Central Falls

EARLY BID PACKAGE DUAL LANGUAGE PK-8 SCHOOL

Solicitation: 2026-0002
Notice ID: 93a9c5f636ce1633ad1ab8c00d3f7641
DepartmentCity of Central FallsStateRIPostedJan 18, 2026, 12:00 AM UTCDueMar 12, 2026, 12:00 AM UTCCloses in 6 days

Federal opportunity from City of Central Falls. Place of performance: RI. Response deadline: Mar 12, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,912,205,491
Sector total $1,912,205,491 • Share 100.0%
Live
Median
$168,000
P10–P90
$28,970$2,500,000
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,912,205,491)
Deal sizing
$168,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
RI, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
RI20260001 (Rev 2)
Match signal: state matchOpen WD
Published Jan 30, 2026Rhode Island • Bristol, Kent, Newport +2
Rate
MATERIAL HANDLER (Includes preparation, wetting, stripping, removal scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)
Base $49.91Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
+81 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 81 more rate previews.
Davis-BaconBest fitstate match
RI20260001 (Rev 2)
Open WD
Published Jan 30, 2026Rhode Island • Bristol, Kent, Newport +2
Rate
MATERIAL HANDLER (Includes preparation, wetting, stripping, removal scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)
Base $49.91Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
Bricklayer, Stonemason, Pointer, Caulker & Cleaner
Base $46.86Fringe $29.14
+80 more occupation rates in this WD
Davis-Baconstate match
RI20260002 (Rev 1)
Open WD
Published Jan 30, 2026Rhode Island • Bristol, Kent, Providence +1
Rate
ELECTRICIAN
Base $42.09Fringe $5.41
Rate
ELEVATOR MECHANIC
Base $64.52Fringe $38.43
Rate
Power Equipment Operator Grader and Roller
Base $39.90Fringe $28.25
+14 more occupation rates in this WD
Davis-Baconstate match
RI20260003 (Rev 1)
Open WD
Published Jan 30, 2026Rhode Island • Newport
Rate
ROOFER
Base $47.49Fringe $31.44
Rate
BRICKLAYER
Base $21.70Fringe $10.85
Rate
CARPENTER Including Drywall Hanging Metal Stud Framing, Form Setting, Batt Insulation, Downspouts & Gutter Installation
Base $12.95Fringe $5.51
+7 more occupation rates in this WD
Davis-Baconstate match
RI20260005 (Rev 1)
Open WD
Published Jan 30, 2026Rhode Island • Bristol, Kent, Newport +2
Rate
Dredging: CLASS A1
Base $48.48Fringe $15.34
Rate
b CLASS A2
Base $43.20Fringe $14.99
Rate
b CLASS B1
Base $41.93Fringe $14.90
+4 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Central Falls
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

No Description Available..

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.